Impressive shallow gold intercepts returned from RC drilling
Released
Released
Announcement PDF
ASX RELEASE
1 December 2025
Horizon Gold Limited ACN: 614 175 923
Suite 8, Level 3, 47 Havelock Street, West Perth WA 6005 | PO Box 39, West Perth WA 6872
Telephone: +61 8 6331 6092 | Email: info@horizongold.com.au | Website: www.horizongold.com.au
1
Gum Creek Gold Project
Impressive shallow gold intercepts returned from RC drilling
HIGHLIGHTS
▪ Significant shallow intercepts returned from RC resource expansion drilling across 4 prospects
within the Gum Creek Gold Project included:
Goldfinch Prospect:
▪ 11m @ 3.18g/t Au from 84m including 5m @ 6.41g/t Au from 85m
▪ 7m @ 3.63g/t Au from 35m including 1m @ 22.4g/t Au from 36m
▪ 11m @ 2.21g/t Au from 70m including 4m @ 4.52g/t Au from 72m
▪ 15m @ 1.55g/t Au from 24m including 6m @ 2.10g/t Au from 28m
▪ 18m @ 1.05g/t Au from 83m
▪ 2m @ 7.42g/t Au from 73m
▪ 2m @ 7.39g/t Au from 4m
▪ 10m @ 1.06g/t Au from 75m including 3m @ 2.94g/t Au from 78m
▪ 5m @ 2.09g/t Au from 6m including 1m @ 6.24g/t Au from 10m
▪ 4m @ 2.60g/t Au from 29m including 2m @ 4.58g/t Au from 29m
Robin Prospect:
▪ 7m @ 2.46g/t Au from 27m including 2m @ 7.61g/t Au from 30m
Thornbill West Prospect:
▪ 2m @ 1.53g/t Au from 23m
▪ Diamond drilling to test previous high grade drill intercepts including 15m @ 28.5g/t Au from 346m
and 10m @ 8.9g/t Au from 190m at Kingfisher, and 30m @ 21.1g/t Au from 57m and 13m @
10.8g/t Au from 122m at Omega) is progressing well with 4 holes at Kingfisher completed to date.
______________________________________________________________________________
Horizon Gold Limited (ASX:HRN) (“Horizon” or “Company”) is pleased to announce significant shallow
gold intercepts from reverse circulation (RC) drilling at its 100% owned Gum Creek Gold Project (“Gum
Creek” or the “Project”) located in the Mid-West Region of Western Australia. The program included a
total of 55 RC holes for 4,352m drilled at the Goldfinch, Robin, Thornbill West and Toucan prospects.
The program infilled historic drilling and the results will eventually be incorporated into the global Gum
2
Creek Mineral Resource Estimate (MRE). All holes in the RC resource expansion program are located
within 2.8 kilometres of the old Gidgee Mill.
Managing Director Leigh Ryan said:
"The recent RC drilling results from the Goldfinch deposit have highlighted the potential to find
additional shallow free milling gold resources close to the old and proposed new processing sites. The
mineralisation will be wireframed in the coming weeks and will ultimately be incorporated into the
Company’s mineral resource estimate."
“Our deep diamond drilling program at Kingfisher which aims to extend known gold mineralisation
down plunge of previous high-grade intercepts is progressing well with core logging, cutting and
sampling well underway and initial results expected in the coming weeks.”
Figure 1: Gum Creek Gold Project existing Mineral Resources, Potential
Mineral Resources and Exploration Targets over simplified geology1
.
1
Refer to Horizon Gold Limited ASX announcement titled “Investor Presentation” dated 13 May 2025.
3
Goldfinch Prospect
The Company completed 31 RC holes for 2,415m at the Goldfinch Prospect located 2km south-
southeast of the old Gidgee Mill. Assay results have confirmed previously identified shallow gold
mineralisation striking NNW and dipping moderately to the SW. Additional drilling along strike to the
north and down dip is required. Drilling returned the following significant gold intercepts (Figures 2 &
3, Table B):
▪ 11m @ 3.18g/t Au from 84m including 5m @ 6.41g/t Au from 85m (GFRC029)
▪ 7m @ 3.63g/t Au from 35m including 1m @ 22.4g/t Au from 36m (GFRC007)
▪ 11m @ 2.21g/t Au from 70m including 4m @ 4.52g/t Au from 72m (GFRC021)
▪ 15m @ 1.55g/t Au from 24m including 6m @ 2.10g/t Au from 28m (GFRC015)
▪ 18m @ 1.05g/t Au from 83m (GFRC031)
▪ 2m @ 7.42g/t Au from 73m (GFRC030)
▪ 2m @ 7.39g/t Au from 4m (GFRC003)
▪ 10m @ 1.06g/t Au from 75m including 3m @ 2.94g/t Au from 78m (GFRC017)
▪ 5m @ 2.09g/t Au from 6m including 1m @ 6.24g/t Au from 10m (GFRC028)
▪ 4m @ 2.60g/t Au from 29m including 2m @ 4.58g/t Au from 29m (GFRC019)
Figure 2: Goldfinch and Toucan Prospects drill hole location plan showing historic
holes coloured by max. downhole gold, and recent drill hole traces (white) and
selected recent gold intercepts >2.5 GxM labelled over satellite image.
4
Figure 3: Goldfinch Prospect cross section showing mineralised envelopes and
recent gold intercepts (labelled).
Robin Prospect
Seven RC holes for 585m were drilled at the Robin prospect located 2km southeast of the old Gidgee
Mill. Assay results have confirmed shallow flat lying supergene gold mineralisation extending to the
south of the Robin open pit. Further drilling to the north and south of the deposit is required. Drilling
returned the following significant gold intercepts (Figures 4 & 5, Table B):
▪ 7m @ 2.46g/t Au from 27m including 2m @ 7.61g/t Au from 30m (RORC001)
▪ 6m @ 0.92g/t Au from 59m including 1m @ 3.67g/t Au from 64m (RORC003)
5
Figure 4: Robin Prospect drill hole location plan showing historic
holes coloured by max. downhole gold and recent drill hole traces
(white) with gold intercepts (labelled) over satellite image.
Figure 5: Robin Prospect cross section showing mineralised
envelopes and recent and historic gold intercepts (labelled).
6
Thornbill West Prospect
The Company completed nine RC holes for 702m at the Thornbill West Prospect located 1.6km
southeast of the old Gidgee Mill. Assay results identified gold mineralisation extending to the north of
the prospect where further drilling is required. Drilling returned the following significant gold intercepts
(Figures 6 & 7, Table B):
▪ 2m @ 1.53g/t Au from 23m (THRC001)
▪ 9m @ 0.64g/t Au from 2m (THRC001)
▪ 9m @ 0.28g/t Au from 35m (THRC004)
Figure 6: Thornbill Prospect drill hole location plan showing historic
holes coloured by max. downhole gold and recent drill hole traces
(white) and recent gold intercepts (labelled) over satellite image.
7
Figure 7: Thornbill West Prospect cross section showing
mineralised envelopes and recent >2 GxM gold intercepts
(labelled).
Toucan Prospect
Eight RCholes for650m were drilled at the Toucan Prospect located 2.6km southeast of the old Gidgee
Mill. Drilling returned a best intercept of 1m @ 2.57g/t Au from 32m (TORC003) and failed to confirm
northern or southern extensions to gold mineralisation (Figure 2, Table B). No further drilling is planned
at Toucan.
Feasibility Study and deep diamond drilling progress
Work on the Gum Creek Feasibility Study is progressing well. Metallurgical, geotechnical, and
processing reports have been received, waste rock, tailings and soil landform reports are well
underway, all environmental and Heritage surveys have been completed, surface water infrastructure
designs, pit and waste rock dump designs and mine infrastructure designs have been completed, and
water management plans and water balance modelling are all advancing well. The Study remains on
schedule for completion H1 CY 2026.
Deep diamond drilling aimed at testing high priority targets down plunge of existing high-grade
mineralisation at the Kingfisher and Omega prospects is progressing well with 4 holes at Kingfisher
completed to date for 2,214m. The program is testing beneath impressive previous drill intercepts
including 15m @ 28.5g/t Au from 346m and 10m @ 8.9g/t Au from 190m2
(Kingfisher), and 30m @
21.1g/t Au from 57m and 13m @ 10.8g/t Au from 122m3
(Omega).
2 Refer to Horizon Gold Limited ASX announcements titled “Diamond drilling returns 15m @ 28.5g/t Au from Kingfisher" dated 12
December 2022 and titled “Outstanding gold intercepts returned from Gum Creek Diamond Drilling” dated 15 March 2022.
3 Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Geological Review” dated 15 February 2021
8
About the Company
Horizon Gold Limited (ASX:HRN) is an exploration company focused on its 100% owned Gum Creek
Project in Western Australia (Figure 8). The Gum Creek Gold Project represents an exciting gold
exploration and potential development opportunity that currently contains a Mineral Resource Estimate
of 37.97Mt @ 1.89g/t Au for 2.30 million ounces of gold (Table A) including Indicated and Inferred
resource classifications in accordance with the Australasian Code for Reporting of Identified Mineral
Resources and Ore Reserves (JORCCode 2012 edition). The indicated portion of the MREis 26.72Mt
@ 1.90g/t Au for 1.63Moz4
, representing 71% of the total resource ounces.
Figure 8: Gum Creek Gold Project and surrounding gold resources and operating gold processing facilities.
4 Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Project Gold Resource Update” dated 4 November 2025
9
Horizon Gold Limited Mineral Resources
Table A: Gum Creek Gold Resources as at 4 November 2025
Resource
Resource
Date
Cut-off
grade
(g/t Au)
Indicated Inferred Total
Tonnes
Au
(g/t)
Gold (oz) Tonnes
Au
(g/t)
Gold
(oz)
Tonnes
Au
(g/t)
Gold (oz)
Swan/Swift OC Nov-25 0.4 6,661,000 1.86 399,000 335,000 1.54 16,600 6,996,000 1.85 415,600
Swan UG* Nov-25 1.5 935,000 4.45 133,700 798,000 3.90 100,000 1,733,000 4.19 233,700
Swift UG* Nov-25 1.5 35,000 2.22 2,500 813,000 2.54 66,300 848,000 2.52 68,800
Wilsons UG* Nov-25 1.5 2,759,000 4.37 387,400 126,000 3.16 12,800 2,885,000 4.31 400,200
Howards Nov-25 0.4 6,095,000 1.13 221,800 751,000 0.97 23,500 6,846,000 1.11 245,300
Kingfisher OC Nov-25 0.6 1,139,000 2.05 75,100 79,000 1.50 3,800 1,218,000 2.01 78,900
Kingfisher UG* Nov-25 1.5 94,000 2.71 8,200 949,000 3.45 105,300 1,043,000 3.38 113,500
Heron May-23 0.6 330,000 2.11 22,400 1,822,000 1.51 88,200 2,152,000 1.60 110,600
Eagle Nov-25 0.4 817,000 1.27 33,400 1,202,000 1.29 50,000 2,019,000 1.28 83,400
Heron South May-23 0.8 720,000 1.79 41,400 761,000 1.53 37,500 1,481,000 1.66 78,900
Shiraz Nov-25 0.4 1,947,000 1.04 65,400 372,000 0.94 11,200 2,319,000 1.03 76,600
Wyooda** Nov-25 0.8 557,000 1.54 27,500 718,000 1.56 36,100 1,275,000 1.55 63,600
Snook Jul-22 0.8 75,000 2.57 6,200 846,000 1.76 47,800 921,000 1.82 54,000
Toedter Nov-25 0.6 905,000 1.31 38,200 99,000 1.32 4,200 1,004,000 1.31 42,400
Hawk Nov-25 0.6 591,000 1.38 26,200 167,000 1.27 6,800 758,000 1.35 33,000
Specimen Well Nov-25 0.6 431,000 1.49 20,600 114,000 1.31 4,800 545,000 1.45 25,400
Wedge Nov-25 0.6 427,000 1.42 19,500 56,000 2.83 5,100 483,000 1.58 24,600
Camel Bore Jul-22 0.8 379,000 1.47 17,900 100,000 1.21 3,900 479,000 1.42 21,800
Melbourne Bitter Nov-25 0.6 318,000 1.46 14,900 157,000 1.27 6,400 475,000 1.39 21,300
Hyperno-Reliance Nov-25 0.6 295,000 1.52 14,400 183,000 1.02 6,000 478,000 1.33 20,400
Kearrys May-23 0.6 450,000 1.24 18,000 46,000 1.35 2,000 496,000 1.25 20,000
Psi Jul-22 0.8 100,000 2.08 6,700 226,000 1.69 12,300 326,000 1.81 19,000
Deep South
Reliance
Nov-25 0.6 229,000 1.53 11,300 17,000 0.91 500 246,000 1.49 11,800
Orion Jul-22 0.8 69,000 1.49 3,300 182,000 1.40 8,200 251,000 1.43 11,500
Eagles Peak May-23 0.6 264,000 1.19 10,100 41,000 0.99 1,300 305,000 1.16 11,400
Wahoo Jul-22 0.8 - - - 258,000 1.25 10,400 258,000 1.25 10,400
Fangio May-23 0.6 99,000 1.32 4,200 30,000 1.35 1,300 129,000 1.33 5,500
Total 26,721,000 1.90 1,629,300 11,248,000 1.86 672,300 37,969,000 1.89 2,301,600
* Cut-off grades for Swan, Swift, Wilsons and Kingfisher underground Indicated and Inferred are 1.5g/t Au.
** Wyooda includes the Kingston Town, Think Big and Manikato resources which are within 600m and 200m of each other respectively.
Note: Figures have been rounded.
10
Table B: Significant RC Drill Hole Intercepts (>2 GxM)
Prospect Hole ID East North RL Dip Azi Depth From To Width Au g/t
Goldfinch GFRC001 739410 6980603 515 -59 56 75 NSI
Goldfinch GFRC002 739394 6980592 515 -60 56 90 28 32 4 1.58
incl. 30 31 1 5.18
Goldfinch GFRC003 739374 6980644 516 -60 59 75 4 6 2 7.39*
28 36 8 0.47
Goldfinch GFRC004 739358 6980633 516 -60 58 90 NSI
Goldfinch GFRC005 739337 6980690 516 -61 58 65 NSI
Goldfinch GFRC006 739320 6980679 516 -60 56 80 21 27 6 0.46
Goldfinch GFRC007 739306 6980718 516 -60 58 65 35 42 7 3.63
incl. 36 37 1 22.40
Goldfinch GFRC008 739288 6980705 516 -60 56 80 16 26 10 0.25*
34 41 7 0.91
incl. 36 38 2 1.95
50 54 4 0.50
58 63 5 0.56
Goldfinch GFRC009 739275 6980745 516 -61 59 65 NSI
Goldfinch GFRC010 739256 6980733 516 -60 57 80 NSI
Goldfinch GFRC011 739214 6980800 516 -59 56 65 35 40 5 0.48
Goldfinch GFRC012 739203 6980792 516 -75 58 75 43 47 4 0.78
incl. 43 45 2 1.21
Goldfinch GFRC013 739186 6980827 516 -60 57 65 25 28 3 0.79
Goldfinch GFRC014 739157 6980857 516 -75 58 60 41 47 6 0.40
Goldfinch GFRC015 739110 6980922 516 -76 60 55 24 39 15 1.55
incl. 28 34 6 2.10
Goldfinch GFRC016 739150 6980805 516 -51 56 85 68 71 3 1.08
Goldfinch GFRC017 739124 6980835 516 -59 57 90 75 85 10 1.06
incl. 78 81 3 2.94
Goldfinch GFRC018 739079 6980901 516 -59 55 80 56 60 4 0.74
incl. 59 60 1 1.64
Goldfinch GFRC019 739062 6980987 516 -69 56 55 10 21 11 0.89
incl. 12 19 7 1.07
29 33 4 2.60
incl. 29 31 2 4.58
Goldfinch GFRC020 739015 6981051 516 -75 57 55 35 38 3 1.84
incl. 35 36 1 5.11
Goldfinch GFRC021 738990 6981131 517 -60 57 90 70 81 11 2.21
incl. 72 76 4 4.52
Goldfinch GFRC022 738974 6981121 517 -60 56 120 2 3 1 3.21
14 16 2 1.99
89 92 3 1.15
Goldfinch GFRC023 738974 6981217 517 -60 57 70 NSI
Goldfinch GFRC024 738956 6981205 517 -60 54 85 81 85 EOH 4 0.56
Goldfinch GFRC025 738941 6981194 517 -59 59 105 NSI
Goldfinch GFRC026 738966 6981235 517 -60 59 65 NSI
Goldfinch GFRC027 738925 6981231 517 -64 57 75 48 50 2 1.81
incl. 48 49 1 3.18
60 66 6 0.55
incl. 60 61 1 2.01
Goldfinch GFRC028 738895 6981308 517 -60 59 55 6 11 5 2.09
incl. 10 11 1 6.24
23 31 8 0.40
Goldfinch GFRC029 738894 6981211 517 -55 59 95 84 95 EOH 11 3.18
incl. 85 90 5 6.41
11
Prospect Hole ID East North RL Dip Azi Depth From To Width Au g/t
Goldfinch GFRC030 738863 6981287 517 -51 57 75 73 75 EOH 2 7.42
Goldfinch GFRC031 738909 6981174 517 -51 58 130 83 101 18 1.05
97 100 3 2.27
115 119 4 2.12
118 119 1 6.53
Robin RORC001 739908 6981623 516 -60 271 130 27 34 7 2.46
incl. 30 32 2 7.61
Robin RORC002 739910 6981721 516 -74 273 85 NSI
Robin RORC003 739829 6981723 517 -51 89 100 59 65 6 0.92
incl. 64 65 1 3.67
Robin RORC004 739809 6981706 517 -70 273 60 NSI
Robin RORC005 739907 6981803 517 -60 93 60 NSI
Robin RORC006 739886 6981803 517 -60 89 70 NSI
Robin RORC007 739866 6981803 517 -60 88 80 NSI
Thornbill West THRC001 739083 6981913 517 -60 92 30 2 11 9 0.64
23 25 2 1.53
Thornbill West THRC002 739102 6981833 517 -60 89 55 NSI
Thornbill West THRC003 739082 6981834 517 -60 87 75 NSI
Thornbill West THRC004 739063 6981832 517 -60 92 95 35 44 9 0.28
Thornbill West THRC005 739074 6981812 517 -60 91 71 NSI
Thornbill West THRC006 739055 6981813 517 -60 90 100 NSI
Thornbill West THRC007 739116 6981717 517 -60 91 71 NSI
Thornbill West THRC008 739097 6981717 517 -60 88 90 NSI
Thornbill West THRC009 739077 6981716 517 -60 88 115 NSI
Toucan TORC001 739649 6980711 515 -60 240 70 NSI
Toucan TORC002 739665 6980721 515 -60 239 80 NSI
Toucan TORC003 739610 6980782 515 -60 240 70 32 33 1 2.57
Toucan TORC004 739628 6980793 515 -60 238 75 NSI
Toucan TORC005 739581 6980822 515 -60 239 85 NSI
Toucan TORC006 739599 6980832 516 -60 238 90 NSI
Toucan TORC007 739530 6980895 516 -60 239 85 NSI
Toucan TORC008 739549 6980907 516 -59 236 95 NSI
Notes: All coordinates are GDA94 zone 50, all intercepts use a 0.2 g/t Au lower cut, no upper cut, 2m maximum internal dilution and all
intercepts >2.0 GxM are reported. NSI = no significant intercept >2.0 GxM * includes 2m composite sample
This ASX announcement was authorised for release by the Horizon Board.
For further information contact:
Leigh Ryan
Managing Director
+61 8 9336 3388
12
Competent Persons Statement:
The information in this announcement thatrelates to exploration activities,exploration results and Mineral Resources is based
on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists. Mr Ryan is the
Managing Director ofHorizon Gold Limited and holds shares and options in the Company,Mr Ryan has sufficientexperience,
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Ryan consents to the inclusion in the announcement of the
matters based on information provided in the form and context in which it appears.
No New Information or Data:
This announcementcontains references to Mineral Resource estimates,all of which have been cross referenced to previous
marketannouncements.The Company confirms thatitis not aware ofany additional informationor data thatmaterially affects
the information included in the relevant market announcements and,in the case of estimates of Mineral Resources,that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed.
Forward Looking Statements:
This ASX announcement may contain certain “forward-looking statements” which may not have been based solely on
historical facts but rather may be based on the Company’s current expectations about future events and results. Where the
Company expresses or implies an expectation or beliefas to future events or results, such expectation or beliefis expressed
in good faith and believed to have a reasonable basis.However,forward lookingstatements are subjectto risks,uncertainties,
assumptions and other factors, which could cause actual results to differ materially from future results expressed,projected
or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency
fluctuations, as well as political and operational risks and governmental regulation and judicial outcomes.
13
APPENDIX 2: JORC TABLE 1 (SECTIONS 1 AND 2)
Section 1 - Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, orhandheld
XRF instruments, etc). These examples
should not be takenas limiting thebroad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where „industry standard‟ work
has been done this would be relatively
simple (eg „reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay‟). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Reverse Circulation (RC) drill holes were routinely sampled at 1m
intervals down the hole. The upper sections of some holes were
sampled at 2m intervals.
• Samples were collectedat the drill rig usinganindustry standardrig-
mounted cone splitter to collect a nominal 2 - 3 kg sub sample in a
numbered calicosamplebag, with theremaining sample retained at
the drill site for future resampling and/or metallurgical sampling if
required.
• Routine standard reference material, sample blanks, and sample
duplicates were inserted/collected at every 25th sample in the
sample sequence.
• All RC samples were submitted to Australian Laboratory Services
(ALS) in Perth for preparation (including pulverising) to produce a
50g sub-sample for analysis for gold by 50g Fire Assay.
Pre-2014 Drillholes
• All RC samples were collected at 1m intervals through the drill rig
cyclone and then split via riffle andconesplitters. RC samples were
typically dry. Composite samples were collected by tube sampling
the bulk RC sample bags.
• Initially assaying utilised the aqua regia process but most assays
used in this report have beenby fire assay with an AASfinish using
the site laboratory or off-site laboratories. A 50g charge was
generally used.
• Afterthe year2000,samples (mainly gradecontrol)wereassayedat
the accredited on-site laboratory at Gidgee using the Leachwell
method. Leachwell cyanide(bottle-roll)assays are apparently more
predictive of expectedrecoveries from Carbon-in-Pulp gold recovery
plants, so provide a more realistic grade estimate.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• All RC holes were completed by reverse circulation (RC) drilling
techniques using a DR05 SREPS SR650 drill rig and auxiliary
compressor.
• Drill rod diameter was 4.5” (114mm) and drill bit diameter was
nominally 143mm to 146mm.
• A face sampling downhole hammer(5' type 760 SREPS)was used
at all times.
• All RC drill holes were surveyed for down hole deviation using an
Axis Champ Navigator north seeking downhole gyro with downhole
readings collected every 5m.
Pre-2014 Drillholes
• RC drilling was completed with industry standard RC drill rigs using
a 4.5”to 5.5”drill bit with eithera cross-oversub ora face sampling
hammer.
14
Criteria JORC Code explanation Commentary
Drill sample
recovery
• Method of recordingand assessingcore
and chip sample recoveries and results
assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due topreferential loss/gain of
fine/coarse material.
• A qualitative estimate of sample recovery was done for each RC
sample metre collected from the drill rig.
• A qualitativeestimateof RC sample weightwas completedto ensure
consistency of sample size and to monitor sample recoveries.
• Most RC material was dry when sampled, with damp and wet
samples noted in sample sheets and referred to whenassayswere
received.
• RC sample recovery andquality is considered tobeadequateforthe
drilling technique employed.
Pre-2014 Drillholes
• Where documented, RC drilling returned good recoveries, however
drill recoveries for some historical holes are not known.
• All RC samples were split and mixed in the riffle splitting process.
• There is no evidence of there being sample bias due to non-
representative or preferential sampling.
• No apparent relationships were noted in relation tosample recovery
and grade.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitativein nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• All RC drill holes were geologically logged by a qualified Geologist.
• Qualitative andquantitativegeological logging recordedcolour, grain
size, weathering, oxidation, lithology, alteration, veining and
mineralisation including theabundance of specificminerals, veining,
and alteration using an industry standard logging and geological
coding system.
• A small sample of all RC drill material was retained in chip trays for
future reference and validation of geological logging.
Pre-2014 Drillholes
• All historical drill holes havebeenloggedusing the various company
logging codes.Thetypeofdrill log varies with timedependingondrill
technique, year and company.
• Logging included codes and descriptions of weathering, oxidation,
lithology, alteration and veining.
• Geological logging is qualitative andbased onvisual field estimates.
• Not all RC logs have been converted to a digital format.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whetherquarter,half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adoptedfor
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• All RC samples were cone split at the drill rig with sample size and
wet/dry notes made on RC sample sheets.
• RC duplicate samples were taken every 25 samples to evaluate
whethersamples were representative and as a check onlaboratory
methods.
• Sample preparation was undertaken by ALS Perth.
• At the laboratory, samples were weighed, dried and crushed to -
6mm. The crushed sample was subsequently bulk-pulverised in an
LM5 ring mill to achieve a nominal particle size of 85% passing
<75um.
• Sample sizes and laboratory preparation techniquesare considered
to be appropriate for the commodity being targeted.
Pre-2014 Drillholes
• RC sampling involved1m RC cuttings,split using riffle splitterin dry
materials and a wedge splitter or rotary splitter in wet materials.
Usually a 2 - 3kg sample was retained.
• Where it has been suspected that drillholes were drilled down dip,
scissor holes have been drilled.
• Most drilling showed good sample recovery with the exception of
some holes drilled in1989. All RC samples were thoroughly mixed in
the riffle splitting process. There is no stated evidenceof therebeing
sample bias due to preferential sampling. There is no relationship
between sample recovery and grade.
• Sample sizes and laboratory preparation techniquesare considered
to be appropriate for the commodity being targeted.
15
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument makeand
model, reading times, calibrations
factors applied andtheirderivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established
• Analysis for gold only was undertaken at ALS Perth using 50g Fire
Assay with AAS finish to a lower detection limit of 0.01ppm. Fire
assay is considered a “total” assay technique.
• No geophysical tools orothernon-assay instrumenttypes wereused
in the analyses reported.
• Review of routine standard reference material and sample blanks
suggest there are no significant analytical bias orpreparationerrors
in the reported analyses.
• Results of analysesfrom field sample duplicates are consistent with
the style of mineralisation being evaluated and considered to be
representative of the geological zones which were sampled.
• Internal laboratory QAQC checks are reported by the laboratory.
• Review of the internal laboratory QAQC suggests the laboratory is
performing within acceptable limits.
Pre-2014 Drillholes
• Initially, assaying utilised the aqua regia process but most assays
referred to in this report have beenby fire assay with an AAS finish
using the site laboratory or off-site laboratories. A 50g charge was
used. After 2000, samples were assayed at the Gidgee accredited
mine-site laboratory usingtheLeachwell methodwith approximately
30g of sample pulverised to 85% passing -200 mesh. The analytic
techniques are considered appropriate. Wherecoarse goldoccurred,
offsite screenfire assaying was carriedout usinga 105 micronsieve.
• Samples were submitted to off-site laboratories with check assays
carried out in 1988. Further check assays were carried out in other
years however this data has not been analysed. Some CRMs and
blank samples were usedpriorto 2002howeverthere is insufficient
information to complete an accurate analysis. There are records of
laboratory standards and blanks having been submitted post 2002
and an analysis of theseshows good correlationbetweenresults. No
evidence has been found in the mining process that there were
issues with assaying. An analysis of duplicates showed that in
general the precision of samples was adequate.
Verification of
sampling and
assaying
• The verification of significant
intersections by eitherindependent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• All RC sampling datawas recordedin the field inhard copy form, and
subsequently data entered into Excel spreadsheets.
• Assay results are merged with sampling data using established
database protocols run in-house by HRN.
• Digital data (Excel spreadsheets) were uploaded into a relational
database and validated by experienced database personnel and
geological staff. Plans, cross sections and long sections were
generated,and visual validation wascompletedin 3D (Micromine)as
further quality control.
• Twin holes were not utilized to verify results; however, some infill
verification holes were completed to test the strike continuity of
mineralisation.Virtually all drilling confirmed expectedgeological and
mineralogical interpretations.
• The deposits are reasonably continuous in terms of mineralisation
and grade
Share your feedback
Discover