Impressive water bore gold intercepts and AI collaboration
Released
Released
Announcement PDF
ASX RELEASE
7 October 2025
Horizon Gold Limited ACN: 614 175 923
Suite 8, Level 3, 47 Havelock Street, West Perth WA 6005 | PO Box 39, West Perth WA 6872
Telephone: +61 8 6331 6092 | Email: info@horizongold.com.au | Website: www.horizongold.com.au
1
Gum Creek Gold Project
Impressive gold intercepts returned from water bore drilling and
commencement of AI-powered mineral exploration collaboration
HIGHLIGHTS
Significant intercepts returned from 24 RC water bores drilled across 7 prospects within the Gum
Creek Gold Project included:
Howards Prospect:
39m @ 4.58g/t Au from 133m including 17m @ 9.86g/t Au from 148m
72m @ 2.26g/t Au from 18m including 18m @ 5.09g/t Au from 27m
124m @ 1.27g/t Au from 7m including 16m @ 2.97g/t Au from 88m
38m @ 4.02g/t Au from 112m including 21m @ 6.08g/t Au from 121m
80m @ 1.08g/t Au from 18m including 10m @ 2.12g/t Au from 83m
23m @ 1.23g/t Au from 99m including 3m @ 3.31g/t Au from 112m
Swan-Swift-Shrike Prospects:
23m @ 1.60g/t Au from 97m to EOH including 3m @ 5.06g/t Au from 102m
15m @ 1.19g/t Au from 102m including 4m @ 3.32g/t Au from 102m
12m @ 1.28g/t Au from 57m
Wedge Prospect:
4m @ 3.83g/t Au from 151m
Kingfisher Prospect:
6m @ 1.37g/t Au from 21m including 2m @ 3.72g/t Au from 22m
Artificial Intelligence (“AI”) powered mineral exploration platform (“DORA”) has been initiated
across the Gum Creek Gold Project through a collaborative partnership with VRIFY. DORA delivers
rapid, predictive prospectivity modelling, identifying high-value drilling targets with potentially
enhanced accuracy and reduced human bias.
Resource expansion RC drilling has been completed at Goldfinch, Robin, Thornbill West and
Toucan all located within 3 kilometres of the old Gidgee Mill. All results are awaited.
Diamond drilling to test previous high grade drill intercepts including 15m @ 28.5g/t Au from 346m
and 10m @ 8.9g/t Au from 190m (Kingfisher), and 30m @ 21.1g/t Au from 57m and 13m @ 10.8g/t
Au from 122m (Omega) is due to commence this week.
______________________________________________________________________________
2
Horizon Gold Limited (ASX:HRN) (“Horizon” or “Company”) is pleased to announce numerous,
significant gold intercepts from reverse circulation (RC) water bore drilling at its 100% owned Gum
Creek Gold Project (“Gum Creek” or the “Project”) located in the Mid-West Region of Western Australia.
The water bores were planned by a consultant hydrogeologist and drilled to help build a site-wide water
balance model as part of the ongoing Gum Creek Feasibility Study. The holes were sampled and
assayed for gold due to their proximity to known gold mineralisation and returned numerous significant
intercepts.
The Company is also pleased to announce a strategic partnership with VRIFY Technology Inc.
(“VRIFY”), a global leader in AI-assisted mineral exploration. Using VRIFY's proprietary AI-Assisted
Mineral Discovery Platform, DORA, Horizon looks to combine VRIFY’s largest proprietary mineral
datasets with over 40 years of geological data from Gum Creek to help discover, prioritise and validate
high-potential targets and accelerate growth of the existing 2.14 Moz gold resource. By maximising the
use of all of Horizon Gold’s available exploration data, DORA’s machine-learning models will be able
to enhance the extensive geoscientific and geospatial data in creating AI-generated prospectivity
maps. The software aims to shorten target generation timelines and increase confidence in conceptual
drill targeting.
Managing Director Leigh Ryan said:
"These results certainly support our reasons for sampling and assaying water bores, and although the
exceptional intercepts from Howards are not considered true widths, the results from the Howards
water bores and the other prospect water bores provide valuable insight into the continuity of
mineralisation between existing angled drill holes that will ultimately be incorporated into the
Company’s mineral resource estimates."
"The Company is excited to see what VRIFY’s AI-Assisted Mineral Discovery Platform can produce
from our extensive exploration datasets, see what targets the final probabilistic 3D prospectivity map
produces, and see what prospectivity score the software assigns to each target so we can remain
focussed on drill testing our highest priority value adding targets.”
“It’s a very exciting time for Horizon and we look forward to commencing our deep diamond drilling
program in the coming days and receiving gold results from the Goldfinch-Toucan RC drilling in the
coming weeks.”
Water Bore Drilling Program Results
The Company completed 24 vertical water bores (RC holes) for 2,700m at the Eagle, Hawk, Howards,
Hyperno-Reliance, Kingfisher, Swan-Swift and Wedge prospects. All holes were geologically logged,
sampled, and airlifted with water flows recorded wherever possible. Slotted 50mm casing was inserted
into 10 of the most productive holes for water depth monitoring purposes and for sub-terranean fauna
survey work. Two old production bores were refurbished (one at Swan and one at Kingfisher) and the
most productive hole at Howards was converted into a dewatering bore for water pumping purposes.
Pumping test work has now been completed at all Feasibility Study prospects.
Apart from providing water balance information essential for the Feasibility Study model, gold assays
from the water bore drilling have confirmed historic drilling results, provided valuable continuity of
mineralisation information within the tested prospects, and will increase the resource confidence levels
within each of the resource models.
3
Figure 1: Gum Creek Gold Project existing Mineral Resources, Potential
Mineral Resources and Exploration Targets over simplified geology1
.
Howards Prospect
The Company completed 3 RC holes for 483m including 2 monitoring bores and one dewatering bore
at the Howards Prospect (Figure 1). The holes were drilled into areas of estimated high water flows.
All 3 holes were used for sub-terranean fauna sampling. Drilling successfully intercepted water at
approximately 10m and returned the following significant gold intercepts (Figures 2 & 3, Table B):
72m @ 2.26g/t Au from 18m including 18m @ 5.09g/t Au from 27m (HWWB001)
23m @ 1.23g/t Au from 99m including 3m @ 3.31g/t Au from 112m (HWWB001)
39m @ 4.58g/t Au from 133m including 17m @ 9.86g/t Au from 148m (HWWB001)
124m @ 1.27g/t Au from 7m including 16m @ 2.97g/t Au from 88m (HWWB002)
80m @ 1.08g/t Au from 18m including 10m @ 2.12g/t Au from 83m (HWWB003)
38m @ 4.02g/t Au from 112m including 21m @ 6.08g/t Au from 121m (HWWB003)
1
Refer to Horizon Gold Limited ASX announcement titled “Investor Presentation” dated 13 May 2025.
4
Figure 2: Howards Prospect drill hole location plan showing A$2900/oz optimised
pit shells outlined, recent drill hole traces (black) and recent gold intercepts
(labelled) over interpreted geology.
5
Figure 3: Howards Prospect cross section showing mineralised envelopes and
significant historic and water bore intercepts (>5.0 GxM).
Swan, Swift, Shrike Prospects
Five RC water bores were drilled at the Swan, Swift and Shrike prospects for 470m (Figure 1). Two
holes were converted into monitoring bores. Drilling successfully intercepted water at approximately
37m and returned the following significant gold intercepts (Figures 4 & 5, Table B):
23m @ 1.60g/t Au from 97m to EOH including 3m @ 5.06g/t Au from 102m (SSWB004)
15m @ 1.19g/t Au from 102m including 4m @ 3.32g/t Au from 102m (SSWB001)
12m @ 1.28g/t Au from 57m (SSWB002)
6m @ 1.42g/t Au from 77m (SSWB002)
2m @ 2.68g/t Au from 31m (SSWB003)
6
Figure 4: Swan-Swift Area drill hole location plan showing A$2900/oz optimised pit
shells outlined, water bore collars (blue) and water bore gold intercepts >3 GxM
(labelled) over satellite image.
Figure 5: Swift Prospect cross section showing mineralised envelope
and significant historic and water bore intercepts.
7
Wedge Prospect
The Company completed 2 RC holes for 282m at the Wedge Prospect (Figure 1). Drilling successfully
intercepted water at a depth of 28m and returned the following significant gold intercepts (Figures 6 &
7, Table B):
4m @ 3.83g/t Au from 151m (WEWB002)
3m @ 2.19g/t Au from 145m (WEWB002)
2m @ 2.00g/t Au from 113m (WEWB001)
Figure 6: Wedge Prospect drill hole location plan showing
A$2900/oz optimised pit shell outlines, water bore collars
(blue) and water bore gold intercepts >3 GxM (labelled) over
satellite image.
8
Figure 7: Wedge Prospect showing mineralised envelopes and
significant historic and water bore intercepts (>5 GxM).
Kingfisher Prospect
Five RC water bores were drilled at the Kingfisher Prospect for 608m including 2 monitoring bores and
one troglofauna sampling bore (Figure 1). Drilling successfully intercepted water at approximately 38m
and returned the following significant gold intercept (Figures 8 & 9, Table B). KFWB002 was the only
water bore drilled in the vicinity of known gold mineralisation.
6m @ 1.37g/t Au from 21m including 2m @ 3.72g/t Au from 22m (KFWB002)
9
Figure 8: Kingfisher Prospect drill hole location plan showing water bore collars
(blue) and water bore gold intercepts >3 GxM (labelled) over satellite image.
10
Figure 9: Kingfisher Prospect cross section showing mineralised envelopes and
significant historic and water bore intercepts (>2 GxM).
Summary of Drilling Results from Eagle, Hyperno-Reliance and Hawk Prospects
The Company completed 2 RC holes for 299m at the Eagle Prospect (Figure 1). Drilling successfully
intercepted water at a depth of 32m and returned best gold intercepts of 2m @ 1.04g/t Au from 25m
(EAWB001) and 3m @ 1.43g/t Au from 114m (EAWB001) (Figure 4, Table B):
Four RC water bores were drilled at the Hyperno-Reliance Prospect for 222m (Figure 1). Three bores
were cased as monitoring bores and all 3 used for sub-terranean fauna sampling purposes. Drilling
successfully intercepted water at approximately 8m and returned a best gold intercept of 3m @ 1.03g/t
Au from 26m (HYWB002) (Table B).
Three RC water bores were drilled at the Hawk Prospect for 336m (Figure 1). One bore was cased as
a monitoring bore. Drilling successfully intercepted water at approximately 8m and returned a best gold
intercept of 8m @ 0.74g/t Au from 72m (HKWB001) (Table B).
All gold mineralisation encountered in the water bore drilling program will be incorporated into the
respective mineralisation wireframes and ultimately incorporated into an updated mineral resource
estimate.
11
Feasibility Study Progress, Deep Diamond Drilling and AI Exploration
Work on the Gum Creek Feasibility Study remains on schedule for completion H1 CY 2026, with a
draft processing report received, most environmental and Heritage surveys completed, and mine
design and water balance modelling all advancing well.
Resource expansion RC drilling has been completed at Goldfinch, Robin, Thornbill West and Toucan
all located within 3 kilometres of the old Gidgee Mill. All results are awaited.
Deep diamond drilling aimed at testing high priority targets down plunge of existing high-grade
mineralisation at the Kingfisher and Omega prospects is due to commence this week. The drilling will
test beneath impressive previous drill intercepts including 15m @ 28.5g/t Au from 346m and 10m @
8.9g/t Au from 190m2
(Kingfisher), and 30m @ 21.1g/t Au from 57m and 13m @ 10.8g/t Au from
122m3
(Omega).
VRIFY have commenced the exploration data integration process, compiling all relevant drilling,
geochemical, geophysical, structural, and topographic data into VRIFY’s DORA AI-platform for
processing and augmentation. Completion of the initial AI prospectivity model over Gum Creek is
expected Q4 2025, with an exploration target review and target field validation due Q1 2026 and
continuous data addition and target refinement to continue throughout 2026.
About the Company
Horizon Gold Limited (ASX:HRN) is an exploration company focused on its 100% owned Gum Creek
Project in Western Australia (Figure 10). The Gum Creek Gold Project represents an exciting gold
exploration and potential development opportunity that currently contains a Mineral Resource Estimate
of 44.45Mt @ 1.50g/t Au for 2.14 million ounces of gold (Table A) including Indicated and Inferred
resource classifications in accordance with the Australasian Code for Reporting of Identified Mineral
Resources and Ore Reserves (JORC Code 2012 edition). The indicated portion of the MRE is 28.19Mt
@ 1.48g/t Au for 1.35Moz, representing 63% of the total resource ounces.
2 Refer to Horizon Gold Limited ASX announcements titled “Diamond drilling returns 15m @ 28.5g/t Au from Kingfisher" dated 12
December 2022 and titled “Outstanding gold intercepts returned from Gum Creek Diamond Drilling” dated 15 March 2022.
3 Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Geological Review” dated 15 February 2021
12
Figure 10: Gum Creek Gold Project and surrounding gold resources and operating gold processing facilities.
13
Horizon Gold Limited Mineral Resources
Table A: Gum Creek Gold Resources as at 15 May 20234
Resource Date
Cut-off
grade
(g/t Au)
Indicated Inferred Total
Tonnes
Au
(g/t)
Gold (oz) Tonnes
Au
(g/t)
Gold (oz) Tonnes
Au
(g/t)
Gold (oz)
Swan/Swift OC Jul-22 0.4 9,980,000 1.09 349,500 2,735,000 0.96 84,600 12,715,000 1.06 434,100
Swan UG Jul-22 2.5 / 3.0* 301,000 6.91 66,900 226,000 7.10 51,600 527,000 6.99 118,500
Swift UG Jul-22 3.0 - - - 138,000 5.72 25,400 138,000 5.72 25,400
Wilsons UG Jul-13 1.0 2,131,000 5.33 365,000 136,000 5.95 26,000 2,267,000 5.36 391,000
Howards May-23 0.4 8,064,000 0.82 213,100 2,136,000 0.78 53,800 10,200,000 0.81 266,900
Kingfisher OC May-23 0.6 621,000 1.77 35,400 269,000 1.12 9,700 890,000 1.58 45,100
Kingfisher UG May-23 1.5 359,000 3.48 40,200 917,000 3.24 95,500 1,276,000 3.31 135,700
Heron May-23 0.6 330,000 2.11 22,400 1,822,000 1.51 88,200 2,152,000 1.60 110,600
Heron South May-23 0.8 720,000 1.79 41,400 761,000 1.53 37,500 1,481,000 1.66 78,900
Shiraz May-23 0.4 2,539,000 0.70 57,300 1,064,000 0.63 21,600 3,603,000 0.68 78,900
Eagle May-23 0.8 395,000 1.94 24,700 764,000 1.80 44,100 1,159,000 1.85 68,800
Wyooda Jul-22 0.8 430,000 1.56 21,600 862,000 1.56 43,200 1,292,000 1.56 64,800
Snook Jul-22 0.8 75,000 2.57 6,200 846,000 1.76 47,800 921,000 1.82 54,000
Hawk May-23 0.6 378,000 1.28 15,500 471,000 1.25 18,900 849,000 1.26 34,400
Toedter Aug-16 0.5 - - - 689,000 1.54 34,000 689,000 1.54 34,000
Specimen Well May-23 0.8 - - - 529,000 1.50 25,500 529,000 1.50 25,500
Wedge May-23 0.6 - - - 487,000 1.52 23,800 487,000 1.52 23,800
Camel Bore Jul-22 0.8 379,000 1.47 17,900 100,000 1.21 3,900 479,000 1.42 21,800
Kearrys May-23 0.6 450,000 1.24 18,000 46,000 1.35 2,000 496,000 1.25 20,000
Psi Jul-22 0.8 100,000 2.08 6,700 226,000 1.69 12,300 326,000 1.81 19,000
Hyperno-
Reliance
May-23 0.6 119,000 1.73 6,600 326,000 1.16 12,200 445,000 1.31 18,800
Melbourne
Bitter
May-23 0.6 214,000 1.56 10,700 148,000 1.28 6,100 362,000 1.44 16,800
Deep South
Reliance
May-23 0.6 176,000 1.64 9,300 48,000 1.56 2,400 224,000 1.62 11,700
Eagles Peak May-23 0.6 264,000 1.19 10,100 41,000 0.99 1,300 305,000 1.16 11,400
Orion Jul-22 0.8 69,000 1.49 3,300 182,000 1.40 8,200 251,000 1.43 11,500
Wahoo Jul-22 0.8 - - - 258,000 1.25 10,400 258,000 1.25 10,400
Fangio May-23 0.6 99,000 1.32 4,200 30,000 1.35 1,300 129,000 1.33 5,500
Total 28,193,000 1.48 1,346,000 16,257,000 1.51 791,300 44,450,000 1.50 2,137,300
* Cut-off grades are 2.5g/t Au for Swan Underground (UG) Indicated, and 3.0g/t Au for Swan UG Inferred.
** Wyooda includes the Kingston Town, Think Big and Manikato resources which are within 600m and 200m of each other respectively.
Notes: Figures have been rounded.
4
Refer to Horizon Gold Limited ASX Announcement dated 15 May 2023 titled “19% Increase in Gold Resources at Gum Creek Project” to
which the Company confirms there has been no changes.
14
Table B: Significant Drill Hole Intercepts (>2 GxM) – Water Bore Drilling
Prospect Hole ID East North RL Dip Azi Depth From To Width Au g/t
Eagle EAWB001 738849 6981727 520 -89 54 150 25 39 14 0.41
incl 25 27 2 1.04
114 117 3 1.43
EAWB002 738804 6982056 516 -89 188 149 NSR
Hawk HKWB001 740759 6978413 512 -89 210 84 72 80 8 0.74
HKWB002 740524 6978749 512 -89 169 126 NSR
HKWB003 740512 6978686 512 -89 146 126 NSR
Howards HWWB001 754000 6960838 496 -89 15 173 0 1 1 2.93
18 90 72 2.26
incl 27 45 18 5.09
99 122 23 1.23
incl 112 115 3 3.31
133 172 39 4.58
incl 148 165 17 9.86
HWWB002 754004 6960551 496 -89 15 149 7 131 124 1.27
incl 37 52 15 2.16
and 88 104 16 2.97
HWWB003 753999 6960612 496 -89 312 161 0 14 14 0.85
18 98 80 1.08
incl 83 93 10 2.12
112 150 38 4.02
incl 121 142 21 6.08
Hyperno HYWB001 743599 6966171 504 -89 231 54 31 37 6 0.56
HYWB002 743671 6966368 503 -89 224 60 26 29 3 1.03
HYWB003 743901 6966543 503 -89 311 54 NSR
HYWB004 743966 6966697 503 -89 15 54 NSR
Kingfisher KFWB001 740037 6979611 515 -89 99 120 32 36 4 0.79
KFWB002 740402 6979364 513 -89 13 168 21 27 6 1.37
incl 22 24 2 3.72
KFWB003 740354 6979734 514 -89 299 120 NSR
KFWB004 739792 6980033 515 -89 35 100 NSR
KFWB005 739745 6980098 515 -88 228 100 NSR
Swan-Swift SSWB001 739723 6983337 521 -89 260 126 102 117 15 1.19
incl 102 106 4 3.32
122 126 4 0.82
SSWB002 739267 6982581 519 -89 145 100 57 69 12 1.28
77 83 6 1.42
SSWB003 739229 6982646 519 -89 306 100 31 33 2 2.68
incl 31 32 1 5.14
59 63 4 0.88
73 74 1 1.14
87 88 1 1.05
SSWB004 739720 6983260 520 -89 233 120 97 120 23 1.60
incl 102 105 3 5.06
SSWB005 739124 6983290 485 -90 360 24 NSR
Wedge WEWB001 739656 6984813 523 -89 355 126 113 115 2 2.00
WEWB002 739663 6984774 523 -89 344 156 145 148 3 2.19
151 155 4 3.83
Notes: All coordinates are GDA94 zone 50, all intercepts use a 0.2 g/t Au lower cut, no upper cut, 2m maximum internal dilution and all
intercepts >2.0 GxM are reported. NSR = no intercept >2.0 GxM
This ASX announcement was authorised for release by the Horizon Board.
15
For further information contact:
Leigh Ryan
Managing Director
+61 8 9336 3388
Competent Persons Statement:
The information in this announcement that relates to exploration activities, exploration results and Mineral Resources is based
on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists. Mr Ryan is the
Managing Director of Horizon Gold Limited and holds shares and options in the Company, Mr Ryan has sufficient experience,
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Ryan consents to the inclusion in the announcement of the
matters based on information provided in the form and context in which it appears.
No New Information or Data:
This announcement contains references to Mineral Resource estimates, all of which have been cross referenced to previous
market announcements. The Company confirms that it is not aware of any additional information or data that materially affects
the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed.
Forward Looking Statements:
This ASX announcement may contain certain “forward-looking statements” which may not have been based solely on
historical facts but rather may be based on the Company’s current expectations about future events and results. Where the
Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed
in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected
or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency
fluctuations, as well as political and operational risks and governmental regulation and judicial outcomes.
16
APPENDIX 2: JORC TABLE 1 (SECTIONS 1 AND 2)
Section 1 - Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where „industry standard‟ work
has been done this would be relatively
simple (eg „reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay‟). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Reverse Circulation (RC) drill holes were routinely sampled at 1m
intervals down the hole. The upper sections of some holes were
sampled at 2m intervals.
• Samples were collected at the drill rig using an industry standard rig-
mounted cone splitter to collect a nominal 2 - 3 kg sub sample in a
numbered calico sample bag, with the remaining sample retained at
the drill site for future resampling and/or metallurgical sampling if
required.
• Routine standard reference material, sample blanks, and sample
duplicates were inserted/collected at every 25th sample in the
sample sequence.
• All RC samples were submitted to Australian Laboratory Services
(ALS) in Perth for preparation (including pulverising) to produce a
50g sub-sample for analysis for gold by 50g Fire Assay.
Pre-2014 Drillholes
• All RC samples were collected at 1m intervals through the drill rig
cyclone and then split via riffle and cone splitters. RC samples were
typically dry. Composite samples were collected by tube sampling
the bulk RC sample bags.
• Initially assaying utilised the aqua regia process but most assays
used in this report have been by fire assay with an AAS finish using
the site laboratory or off-site laboratories. A 50g charge was
generally used.
• After the year 2000, samples (mainly grade control) were assayed at
the accredited on-site laboratory at Gidgee using the Leachwell
method. Leachwell cyanide (bottle-roll) assays are apparently more
predictive of expected recoveries from Carbon-in-Pulp gold recovery
plants, so provide a more realistic grade estimate.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• All RC holes were completed by reverse circulation (RC) drilling
techniques using a DR05 SREPS SR650 drill rig and auxiliary
compressor.
• Drill rod diameter was 4.5” (114mm) and drill bit diameter was
nominally 143mm to 146mm.
• A face sampling down hole hammer (5' type 760 SREPS) was used
at all times.
• All RC drill holes were surveyed for down hole deviation using an
Axis Champ Navigator north seeking downhole gyro with downhole
readings collected every 5m.
Pre-2014 Drillholes
• RC drilling was completed with industry standard RC drill rigs using
a 4.5” to 5.5” drill bit with either a cross-over sub or a face sampling
hammer.
17
Criteria JORC Code explanation Commentary
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• A qualitative estimate of sample recovery was done for each RC
sample metre collected from the drill rig.
• A qualitative estimate of RC sample weight was completed to ensure
consistency of sample size and to monitor sample recoveries.
• Most RC material was dry when sampled, with damp and wet
samples noted in sample sheets and referred to when assays were
received.
• RC sample recovery and quality is considered to be adequate for the
drilling technique employed.
Pre-2014 Drillholes
• Where documented, RC drilling returned good recoveries, however
drill recoveries for some historical holes are not known.
• All RC samples were split and mixed in the riffle splitting process.
• There is no evidence of there being sample bias due to non-
representative or preferential sampling.
• No apparent relationships were noted in relation to sample recovery
and grade.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• All RC drill holes were geologically logged by a qualified Geologist.
• Qualitative and quantitative geological logging recorded colour, grain
size, weathering, oxidation, lithology, alteration, veining and
mineralisation including the abundance of specific minerals, veining,
and alteration using an industry standard logging and geological
coding system.
• A small sample of all RC drill material was retained in chip trays for
future reference and validation of geological logging.
Pre-2014 Drillholes
• All historical drill holes have been logged using the various company
logging codes. The type of drill log varies with time depending on drill
technique, year and company.
• Logging included codes and descriptions of weathering, oxidation,
lithology, alteration and veining.
• Geological logging is qualitative and based on visual field estimates.
• Not all RC logs have been converted to a digital format.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• All RC samples were cone split at the drill rig with sample size and
wet/dry notes made on RC sample sheets.
• RC duplicate samples were taken every 25 samples to evaluate
whether samples were representative and as a check on laboratory
methods.
• Sample preparation was undertaken by ALS Perth.
• At the laboratory, samples were weighed, dried and crushed to -
6mm. The crushed sample was subsequently bulk-pulverised in an
LM5 ring mill to achieve a nominal particle size of 85% passing
<75um.
• Sample sizes and laboratory preparation techniques are considered
to be appropriate for the commodity being targeted.
Pre-2014 Drillholes
• RC sampling involved 1m RC cuttings, split using riffle splitter in dry
materials and a wedge splitter or rotary splitter in wet materials.
Usually a 2 - 3kg sample was retained.
• Where it has been suspected that drillholes were drilled down dip,
scissor holes have been drilled.
• Most drilling showed good sample recovery with the exception of
some holes drilled in 1989. All RC samples were thoroughly mixed in
the riffle splitting process. There is no stated evidence of there being
sample bias due to preferential sampling. There is no relationship
between sample recovery and grade.
• Sample sizes and laboratory preparation techniques are considered
to be appropriate for the commodity being targeted.
18
Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established
• Analysis for gold only was undertaken at ALS Perth using 50g Fire
Assay with AAS finish to a lower detection limit of 0.01ppm. Fire
assay is considered a “total” assay technique.
• No geophysical tools or other non-assay instrument types were used
in the analyses reported.
• Review of routine standard reference material and sample blanks
suggest there are no significant analytical bias or preparation errors
in the reported analyses.
• Results of analyses from field sample duplicates are consistent with
the style of mineralisation being evaluated and considered to be
representative of the geological zones which were sampled.
• Internal laboratory QAQC
Share your feedback
Discover