Managing Director's AGM Presentation
Released
Released
Announcement PDF
Gum Creek Gold Project
horizongold.com.au
AGM Presentation
23 November 2023
ASX: HRN
IMPORTANT NOTICE AND DISCLAIMER
No New Information or Data
This presentation contains references to exploration results and Resource estimates, all of which have been cross referenced to previous market announcements
made by the Company. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant
market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
Forward Looking Statements
This presentation may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the
Company’s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results,
such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking
statements. Such risks include, but are not limited to metals price volatility, currency fluctuations, as well as political and operational risks and governmental regulation
and judicial outcomes.
Competent Persons Statement
The information in this report that relates to exploration activities and exploration results is based on information compiled by Mr Leigh Ryan, who is a member of The
Australasian Institute of Geoscientists. Mr Ryan is the Managing Director of Horizon Gold Limited and holds shares and options in the Company, Mr Ryan has
sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Ryan
consents to the inclusion in the report of the matters based on information provided in the form and context in which it appears.
2
SOUND INVESTMENT OPPORTUNITY
663km2
2.14Moz
+1Moz
Dominant tenement holding over
most prospective parts of the Gum
Creek Greenstone Belt centred
~80km NNE of Sandstone
44.5Mt @ 1.50g/t Au* Mineral
Resource Estimate on granted
mining leases
+1Moz historical production
from the mining leases
through the Gidgee mill
+40 targets
40 mines
Infrastructure
High quality brownfields and
greenfields exploration targets along
80km of continuous strike
37 historic open pits and 3
underground gold mines all with the
potential to add further gold
resources along strike and at depth
Significant existing infrastructure:
mine camp, tailings dam, air strip,
extensive haul road network and
relic processing plant
* Refer to Horizon Gold ASX Announcement dated 15 May 2023 titled “19% Increase in Gold Resources at Gum Creek Project” and Appendix 1 for more details
3
CORPORATE
ASX code
12 MONTH SHARE PRICE
$0.40
$0.38
Share price (22/11/2023)
$0.29c
Shares on issue
144.8M
Market capitalisation (22/11/2023)
$42.0M
Cash (22/11/2023)
$1.8M
Alto Metals Investment (22/11/2023)
*$2.7M
Enterprise Value
$37.5M
$0.36
Major shareholder
$0.34
BOARD OF DIRECTORS
Non-Executive Chairman
$0.32
Managing Director
$0.30
HRN
**ASX:ZER 75.0%
Peter Sullivan
Leigh Ryan
Non-Executive Director
Jamie Sullivan
Non-Executive Director
Peter Venn
Non-Executive Director
Dugald Morrison
Company Secretary
Trevor O’Connor
$0.28
$0.26
Visible gold in Swan underground ore
* Market value of 60,764,746 shares (8.5%) in Alto Metals (ASX: AME) as at 22/11/2023
** As per substantial shareholder notice dated 14 November 2023
4
GUM CREEK PROJECT
▪ Focussed on one flagship project within
a world class gold mining district
▪ Combined 3.7Moz of undeveloped
resources in the Sandstone-Gum Creek
region (HRN, AME, GML)
▪ High gold resource growth area
▪ 1.1Moz gold produced from the Gidgee
mill between 1987 and 2005 (Arimco,
Australian Resources, Abelle, & Legend Mining)
▪ Mining ceased in March 2005 when the
gold price was around A$560/oz
▪ Strategy is to build on the 2.14Moz
Mineral Resource Estimate (MRE) and
develop a standalone mining operation
▪ Free milling open pit Scoping Study
underway
Swan pit (looking west)
5
GUM CREEK SCOPING STUDY
▪ Scoping study underway for potential recommencement of production based on the following parameters:
▪ Whittle optimised in-pit gold resources
▪ Free milling ore only
▪ Processing throughput between 2.0Mtpa to 3.0Mtpa
▪ 10 to 15 year mine life
▪ Processing plant located at previously permitted Gidgee mill site using established infrastructure wherever
possible (e.g. camp, air strip, haul roads, tailings dam, ROM pad etc.)
▪ In-pit water resources to be used for ore processing
▪ Renewable power and local grid power options
▪ Study completion due March Quarter 2024
▪ Wilsons underground mining scoping study under consideration
6
GUM CREEK RESOURCES & TARGETS
▪ Current Gum Creek MRE of 2.14Moz @ 1.50g/t Au (63%
Indicated) all on mining leases granted pre-native title
▪ MRE increase of 777Koz (57%) over the past 2 years at a
discovery cost of less than A$15/oz
▪ Over 61% of the MRE is free milling (1.3Moz @ 1.22g/t Au)
▪ Five main resource areas including:
Gidgee Shear Zone
Wyooda/Heron Group
Howards
Wilsons Shear Zone
Snook Group
▪ +40 gold resource targets over 80km of continuous strike
▪ Continued focus on shallow free milling oxide targets close to
existing haul roads
▪ Excellent additional resource expansion potential
7
Kingfisher pit (looking south)
GIDGEE SHEAR ZONE
▪ 7km long mineralised system hosting 885,800oz @ 1.53g/t Au close to the Gidgee Mill (MRE 60% Indicated)
▪ Sub-parallel shears up to 60m wide with mineralisation open along strike and down plunge at all deposits
▪ Excellent potential to expand the open cut and underground gold resources (majority of drilling <100m)
▪ Infill drilling planned for potential maiden MRE’s at Toucan, Goldfinch, Robin and South Shrike
▪ All free milling with >90% cyanide leach gold recoveries in oxide, transition & fresh ore
Long Section showing all drill traces, existing pits, $2800/oz
optimised pit shells, >0.2g/t Au mineralisation & resource
block models coloured by Au (g/t).
Refer to Horizon Gold Limited ASX announcements titled “32% Increase in Resources at Gum Creek” dated 25 July 2022
& “19% Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 for resource & pit optimisation information.
8
WYOODA / HERON GROUP
▪ 7km long Wyooda / Heron shear zone hosts a current MRE of 284,800oz @ 1.58g/t Au ~15km along
the haul road to the south of the Gidgee mill
▪ Shallow wide-spaced historic drilling with significant potential to define additional shallow open cut gold
resources along strike and at depth at all seven deposits
▪ >90% cyanide leach gold recoveries in oxide and transitional ore
Long Section showing all drill traces, existing pits,
$2800/oz optimised pit shells, >0.2g/t Au mineralisation
& resource block models coloured by Au (g/t).
Refer to Horizon Gold Limited ASX announcements titled “32% Increase in Resources at Gum Creek” dated 25 July 2022 &
“19% Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 for resource and pit optimisation information.
9
HOWARDS DEPOSIT
▪ Howards MRE: 266,900oz @ 0.81g/t Au (0.4g/t Au cut off)
▪ No previous mining, gold mineralisation at surface up to 50m thick
▪ >90% cyanide leach gold recoveries in oxide, transition & fresh ore
▪ Excellent potential to further increase the gold resource at shallow
depths along strike to the north and south, and expand optimised
pit shells
Refer to Horizon Gold Limited ASX announcements titled “19% Increase in Gold Resources at Gum Creek Project” dated 15 May
2023 for resource and pit optimisation information and titled “Shallow High Grade Gold Intercepts Returned from Howards RC
Drilling” dated 24 October 2022 and “Gum Creek Geological Review” dated 15 February 2021 for drill intercept information.
10
WILSONS SHEAR ZONE
▪ 11km long shear hosting gold mineralisation on a mafic/sediment contact & within
adjacent fractionated dolerites
▪ Shallow drilling along strike to the north of Wilsons with good potential to add
maiden gold resources at the Cab Sav and Camel Bore South prospects
▪ 391,000oz @ 5.4g/t Au MRE at Wilsons deposit (90% Indicated)
▪ Outstanding historic drill intercepts at Wilsons with potential to define further
high-grade gold resources at depth (down plunge)
▪ Wilsons sulphide ore (arsenopyrite) metallurgical testwork produced an overall
metallurgical gold recovery of 87-90%.
Long Section showing all drill traces, existing pits, $2800/oz
optimised pit shells, >0.2g/t Au mineralisation & resource
block models coloured by Au (g/t).
Refer to Horizon Gold Limited ASX announcements titled “32% Increase in Resources at Gum Creek” dated 25 July 2022 & “19%
Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 for resource & pit optimisation information & Panoramic Resources
Limited ASX Announcement titled “Corporate Strategy and positive gold results” dated 27 June 2016 for metallurgy information
11
SNOOK GROUP
▪ Combined MRE of 81,200oz @ 1.64g/t Au over 4.5km of strike
▪ Shallow drilling to date, with good potential to define significant additional resources along strike
and at depth at Snook, Melbourne Bitter and Wahoo prospects
▪ Infill drilling planned for potential maiden MRE’s at Cobia and Alma May
Long Section showing all drill traces, existing pits,
$2800/oz optimised pit shells, >0.2g/t Au mineralisation
& resource block models coloured by Au (g/t).
Refer to Horizon Gold Limited ASX announcements titled “32% Increase in Resources at Gum Creek” dated 25 July 2022 &
“19% Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 for resource and pit optimisation information.
12
2023/2024 WORK PROGRAM
▪ Scoping study based on free milling open pit optimised gold
resources has commenced - completion planned for March
Quarter 2024
▪ 2024 drilling planned with a focus on adding further low-cost
shallow oxide gold resources near the Gidgee mill and at
strategic locations along the existing haul road
▪ Potential deep drilling at Wilsons
▪ MRE upgrade planned for 2024
Wilsons pits (looking south)
13
INVESTMENT HIGHLIGHTS
+2.1 Moz
+1.5g/t Au
MRE
1.3Moz @ 1.22g/t
free milling gold
resource
Open pit scoping
study underway
Established
Infrastructure
Strategic
regional asset
Underexplored
greenstone belt
+40 drill
targets
Further resource
drilling planned
Very supportive
major shareholder
14
CONTACT DETAILS
Leigh Ryan
Managing Director
+61 8 6331 6092
info@horizongold.com.au
horizongold.com.au
Unit 8 / 47 Havelock St.
West Perth, WA 6005
ASX: HRN
Cardigan Drill Target – looking south
15
Appendix 1 : Gum Creek Gold Resources
Note: Figures are rounded.
* cut-off grades are 2.5g/t Au for Swan UG Indicated, and 3.0g/t Au for Swan UG Inferred
** Wyooda includes the Kingston Town, Think Big and Manikato resources
16
Refer to Horizon Gold ASX Announcement titled “19% Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 for more information.