Key Points
Work on the Gum Creek Gold Project Feasibility Study (Study) has commenced with a focus
on resource interpolation methods, mining schedules and costs, processing throughput rates,
and dewatering costs.
Geotechnical drilling to aid open pit designs has been planned, whilst infill and extensional
resource drilling has been designed for the deposits involved in the Study.
The Gum Creek Project has significant resource upside including excellent potential to extend
the 10-year mine life through underground mining and additional drilling at the 12 resource
areas not included in the recent Scoping Study 1.
________________________________________________________________________________
Horizon Gold Limited (ASX: HRN) (Horizon or the Company) is focussed on progressing its
exploration and development activities at the 100%-owned Gum Creek Gold Project (Gum Creek or
the Project) located in the Mid-West Region of Western Australia (Figure 1). Gum Creek has
historically produced more than 1 million ounces of gold and currently hosts a gold resource of 44.45Mt
@ 1.50g/t Au for 2.14 million ounces2. The Project currently covers 504km2 of granted tenure over
the highly prospective and underexplored Gum Creek greenstone belt, which contains 37 open pit and
three underground gold mines.
During the quarter, further work on improving the economic outcomes of the Gum Creek Project was
completed with a continued focus on reducing pre-production capital expenditure. Ordinary kriging
interpolation methods for Swan/Swift, Howards and Shiraz have been assessed and will potentially be
used in the Study. Several mining contractors have been consulted to update mining cost assumptions
for use in the Study, and groundwater management consultants have been engaged to review previous
dewatering costs and water management strategies. Cashflow analysis and mine scheduling work will
also be completed at various processing throughput rates to reassess the optimal throughput for the
Project and the potential for reducing processing plant pre-production capital expenditure.
Approximately 1,900m of HQ diamond drilling has been planned to increase geotechnical knowledge
and aid pit design work, and approximately 10,000m of infill and extensional resource RC drilling has
been designed to increase resource confidence levels at certain deposits and follow-up several
impressive intercepts returned from recent Horizon Gold drilling including 52m @ 5.9g/t Au from 91m
1
2
Refer to Horizon Gold Limited ASX Announcement dated 20 March 2024 titled “Compelling Gum Creek Scoping Study“.
Refer to Horizon Gold Limited ASX Announcement dated 15 May 2023 titled “19% Increase in Resources at Gum Creek Project”.
Horizon Gold Limited ACN: 614 175 923
Suite 8, Level 3, 47 Havelock Street, West Perth WA 6005 | PO Box 39, West Perth WA 6872
Telephone: +61 8 6331 6092 | Email: info@horizongold.com.au | Website: www.horizongold.com.au
1
including 13m @ 16.7g/t Au from 123m 3 (Wedge Prospect) and 24m @ 3.7g/t Au from 124m including
11m @ 7.6g/t Au from 125m 4 (Hawk Prospect).
The Company believes the Gum Creek Gold Project can be a robust, viable stand‐alone mining
operation and the work completed during the quarter represents the initial steps for the planned Gum
Creek Feasibility Study.
The Project has significant upside including excellent potential to extend the 10-year Gum Creek
Scoping Study mine life through resource expansion drilling and underground mining. Underground
mining options and economic evaluation work on the Swan/Swift, Kingfisher, Omega and Wilsons
deposits is yet to be completed, and additional drilling at the 12 open pittable resource areas not
included in the Study will likely increase the resource size of these deposits and elevate them to an
economically viable status, further enhancing the positive financial outcomes of the Gum Creek Gold
Project.
Figure 1: Gum Creek Gold Project and surrounding gold resources and operating gold processing facilities.
3
Refer to Horizon Gold Limited ASX Announcement dated 16 November 2022 titled “Spectacular High Grade Gold Intercept returned from
the Wedge Prospect”.
4
Refer to Horizon Gold Limited ASX Announcement dated 19 September 2022 titled “High Grades and Wide Gold Intercepts returned from
RC Drilling”.
2
Corporate
Alto Metals Limited Share Purchase
In July 2023 the Company acquired 60.8 million shares in Alto Metals Limited (ASX:AME) for $3.17
million which currently represents 8.4% of AME’s issued capital. The average price paid per AME share
was $0.052.
AME owns the Sandstone Gold Project located approximately 90km south of the Gidgee mill. The
Sandstone Gold Project covers over 740km2 of the Sandstone Greenstone Belt and contains an
unconstrained MRE of 23.5Mt @ 1.4g/t Au for 1.05Moz.
On 1 August 2024, Brightstar Resources Limited (ASX:BTR) and AME announced they had entered
into a Scheme Implementation Deed under which AME agreed to propose a Scheme of Arrangement
for the acquisition of 100% of AME by BTR. The transaction has a proforma value of approximately 6
cents per AME share and the AME share price has subsequently increased to similar levels. The value
of AME shares currently owned by Horizon at 6 cents per AME share is $3.65 million. The investment
is under review.
Funding
In September 2024, Horizon increased its short-term funding facility to $1,500,000 (previously
$1,000,000) from Zeta Resources Limited (Horizon’s major shareholder) while the Company reviews
its AME investment. The loan facility is unsecured, can be drawn in tranches of not less than $50,000
and interest is payable at 8.0% per annum. The funds will be repayable by no earlier than 31 December
2024. At quarter end none of the extra $500,000 loan facility had been drawn down.
Director Resignation
On 20 August 2024, Dugald Morrison resigned as a Non-executive Director to focus on other executive
commitments.
Annual General Meeting
The Company will be holding its Annual General Meeting on Thursday 21 November 2024 at 9.30am
(AWST) in the Meeting Room of The Country Women’s Association of Western Australia, 1176 Hay
Street, West Perth, WA 6005.
Additional ASX Listing Rule Disclosures
As required by ASX Listing Rule 5.3, the Company advises it spent $525,000 on exploration and
evaluation activities during the quarter. The expenditure is predominantly related to costs associated
with further economic evaluation of the Gum Creek Gold Project including engineering and geological
consulting services, and ongoing tenement rents and rates. There was no mining development or
production activities conducted during the quarter.
The total amount paid to directors of the entity and their related parties and associates (Section 6 of
Appendix 5B) was $111,000, encompassing the Executive Director’s salary, Non-Executive Directors’
fees and associated superannuation, and $7,000 relating to geological drafting and administration
services.
As at 30 September 2024, Horizon had a cash at hand balance of $305,000.
3
Mining Tenements
The status of the Company’s mining tenements as at 30 September 2024 are detailed in Appendix 1.
This ASX announcement was authorised for release by the Horizon Board.
For further information contact:
Leigh Ryan
Managing Director
+61 8 6331 6092
Horizon Gold Limited Mineral Resources
Table A: Gum Creek Gold Resources as at 15 May 2023
Cut-off
grade
(g/t Au)
Resource
Date
Swan/Swift OC
Swan UG
Swift UG
Wilsons UG
Howards
Kingfisher OC
Kingfisher UG
Heron
Heron South
Shiraz
Eagle
Wyooda
Snook
Hawk
Toedter
Specimen Well
Wedge
Camel Bore
Kearrys
Psi
HypernoReliance
Melbourne
Bitter
Deep South
Reliance
Eagles Peak
Orion
Wahoo
Fangio
Jul-22
Jul-22
Jul-22
Jul-13
May-23
May-23
May-23
May-23
May-23
May-23
May-23
Jul-22
Jul-22
May-23
Aug-16
May-23
May-23
Jul-22
May-23
Jul-22
0.4
2.5 / 3.0*
3.0
1.0
0.4
0.6
1.5
0.6
0.8
0.4
0.8
0.8
0.8
0.6
0.5
0.8
0.6
0.8
0.6
0.8
May-23
Total
Indicated
Au
Tonnes
Gold (oz)
(g/t)
9,980,000
301,000
2,131,000
8,064,000
621,000
359,000
330,000
720,000
2,539,000
395,000
430,000
75,000
378,000
379,000
450,000
100,000
1.09
6.91
5.33
0.82
1.77
3.48
2.11
1.79
0.70
1.94
1.56
2.57
1.28
1.47
1.24
2.08
349,500
66,900
365,000
213,100
35,400
40,200
22,400
41,400
57,300
24,700
21,600
6,200
15,500
17,900
18,000
6,700
0.6
119,000
1.73
May-23
0.6
214,000
1.56
May-23
0.6
176,000
May-23
Jul-22
Jul-22
May-23
0.6
0.8
0.8
0.6
264,000
69,000
99,000
28,193,000
Inferred
Au
Tonnes
Gold (oz)
(g/t)
Tonnes
434,100
118,500
25,400
391,000
266,900
45,100
135,700
110,600
78,900
78,900
68,800
64,800
54,000
34,400
34,000
25,500
23,800
21,800
20,000
19,000
445,000
1.31
18,800
6,100
362,000
1.44
16,800
1.56
2,400
224,000
1.62
11,700
0.99
1.40
1.25
1.35
1,300
8,200
10,400
1,300
305,000
251,000
258,000
129,000
1.16
1.43
1.25
1.33
11,400
11,500
10,400
5,500
0.96
7.10
5.72
5.95
0.78
1.12
3.24
1.51
1.53
0.63
1.80
1.56
1.76
1.25
1.54
1.50
1.52
1.21
1.35
1.69
84,600
51,600
25,400
26,000
53,800
9,700
95,500
88,200
37,500
21,600
44,100
43,200
47,800
18,900
34,000
25,500
23,800
3,900
2,000
12,300
12,715,000
527,000
138,000
2,267,000
10,200,000
890,000
1,276,000
2,152,000
1,481,000
3,603,000
1,159,000
1,292,000
921,000
849,000
689,000
529,000
487,000
479,000
496,000
326,000
6,600
326,000
1.16
12,200
10,700
148,000
1.28
1.64
9,300
48,000
1.19
1.49
1.32
10,100
3,300
4,200
41,000
182,000
258,000
30,000
1,346,000
16,257,000
Gold (oz)
1.06
6.99
5.72
5.36
0.81
1.58
3.31
1.60
1.66
0.68
1.85
1.56
1.82
1.26
1.54
1.50
1.52
1.42
1.25
1.81
2,735,000
226,000
138,000
136,000
2,136,000
269,000
917,000
1,822,000
761,000
1,064,000
764,000
862,000
846,000
471,000
689,000
529,000
487,000
100,000
46,000
226,000
1.48
Total
Au
(g/t)
1.51
791,300
44,450,000
1.50
2,137,300
* Cut-off grades are 2.5g/t Au for Swan Underground (UG) Indicated, and 3.0g/t Au for Swan UG Inferred.
** Wyooda includes the Kingston Town, Think Big and Manikato resources which are within 600m and 200m of each other respectively.
Notes: Figures have been rounded.
4
Table B: Altair Inferred Base Metal Mineral Resource as at 14 March 2023
Cut-off
Total Tonnes & Grade
Total Metal Content
ZnEq %
Mt
ZnEq %
Zn %
Cu %
Ag g/t
ZnEq (Kt)
Zn (Kt)
Cu (Kt)
Ag (Moz)
2.0
7.0
2.9
1.8
0.5
5.0
200
130
30
1.1
Note: The metal equivalent calculation formula is ZnEq % = Zn (%) + 2.78 x Cu (%) + 0.018 x Ag (g/t) using metal prices of A$4,500/t Zn,
A$12,500/t Cu and A$30/oz Ag. Based on preliminary metallurgical studies, recoveries used were 90% for Zn, 90% for Cu, and 75% for
Ag. Figures have been rounded.
Competent Persons Statement:
The information that relates to the Scoping Study and the information that relates to Exploration Results in this announcement
is based on information compiled by Mr Leigh Ryan, who is a member of The Australasian Institute of Geoscientists. Mr Ryan
is the Managing Director of Horizon Gold Limited and holds shares and options in the Company, Mr Ryan has sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Ryan consents to the inclusion in the report of the matters
based on information provided in the form and context in which it appears.
No New Information or Data:
This announcement contains references to Mineral Resource estimates, all of which have been cross referenced to previous
market announcements. The Company confirms that it is not aware of any additional information or data that materially affects
the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed.
Forward Looking Statements:
This ASX announcement may contain certain “forward-looking statements” which may not have been based solely on
historical facts, but rather may be based on the Company’s current expectations about future events and results. Where the
Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed
in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected
or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency
fluctuations, as well as political and operational risks and governmental regulation and judicial outcomes.
5
APPENDIX 1:
(a) Horizon Group Mining Tenements held as at 30 September 2024
Lease
E51/1538
E51/1844
E51/2027
E51/2028
E53/1725
E53/1955
L51/93
L53/46
L53/47
L53/95
L53/96
L53/116
L53/199
L57/20
L57/44
L57/47
M51/104
M51/105
M51/157
M51/185
M51/186
M51/290
M51/410
M51/458
M53/10
M53/11
M53/105
M53/153
M53/251
M53/500
M53/716
M53/904
M53/988
M57/634
M57/635
E53/2162
E53/2168
E57/1177
P53/1702
E57/1405
E57/1407
E51/2203
E53/2321
Location
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Area of
Interest
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Status
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Application
Application
Expiry Date
03-Feb-26
22-Jan-28
09-Sep-26
09-Sep-26
03-Jul-25
18-Jan-28
24-Nov-34
28-Feb-25
26-Sep-25
13-Dec-28
13-Dec-28
30-Jul-44
29-Jul-36
20-Jun-44
12-Jun-33
13-Aug-34
11-May-29
09-May-31
09-Mar-30
18-Feb-30
18-Feb-30
09-May-31
10-Mar-34
09-Feb-35
24-Nov-25
24-Nov-25
29-Aug-30
28-Jun-32
02-Sep-34
21-May-42
07-Sep-40
28-Sep-42
12-Mar-45
14-Jul-35
01-Sep-35
07-Feb-27
01-Mar-27
30-Jun-27
30-Sep-27
N/A
N/A
N/A
N/A
Holder
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
Horizon's
Interest
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Mineral
Rights
All
All
All
All
All
All
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
All
6
Lease
E57/1421
L51/136
L53/307
L53/308
L53/310
L57/71
Location
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Gidgee
Area of
Interest
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Gum Creek
Status
Application
Application
Granted
Granted
Application
Granted
Expiry Date
N/A
N/A
23-Jul-45
23-Jul-45
N/A
17-Sep-45
Holder
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
GUM CREEK
E= Exploration Licence (WA) M = Mining Lease (WA)
P = Prospecting Licence (WA)
Holder: GUM CREEK = Gum Creek Gold Mines Pty Ltd (100% Subsidiary of Horizon Gold Limited)
Horizon's
Interest
100%
100%
100%
100%
100%
100%
Mineral
Rights
All
Infrastructure
Infrastructure
Infrastructure
Infrastructure
Infrastructure
L = Miscellaneous Licence (WA)
* Renewal Application submitted
(b) Changes of Interest in mining tenements during the quarter
Tenement Reference and
Location
L53/307 Gidgee
L53/308 Gidgee
L57/71 Gidgee
L53/310 Gidgee
Nature of Interest
Interest at beginning of Quarter
Interest at end of Quarter
100%
100%
100%
0%
100%
100%
100%
100%
Interest at beginning of Quarter
Interest at end of Quarter
Application Granted
Application Granted
Application Granted
Application
(c) Farm-in or farm-out changes during the Quarter
Tenement Reference and
Location
Nature of Interest
Nil
7
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
HORIZON GOLD LIMITED
ABN
Quarter ended (“current quarter”)
27 614 175 923
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
4
4
(a) exploration & evaluation (if expensed)
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs (incl for Care & Maint.)
(32)
(32)
(e) direct site Care & Maint. costs
(1)
(1)
(218)
(218)
(f)
administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
3
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (FY 2023 WA State MRF payment)
(145)
(145)
1.9
Net cash from / (used in) operating
activities
(389)
(389)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(525)
(525)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation (if capitalised)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to/from other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – security deposits paid
Other – security deposits received
-
-
2.6
Net cash from / (used in) investing
activities
(525)
(525)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
1,000
1,000
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other – Lease payments
-
-
3.10
Net cash from / (used in) financing
activities
1,000
1,000
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
219
219
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(389)
(389)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(525)
(525)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,000
1,000
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
305
305
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
284
198
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other – Term Deposits < 3 months
21
21
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
305
219
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
111
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
7
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
1,500
1,000
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
500
In September 2024, Horizon increased its short-term funding facility to $1,500,000
(previously $1,000,000) from Zeta Resources Limited (Horizon’s major shareholder). In
summary, the terms of the facility are that the fund will be loaned unsecured, can be drawn
in tranches of not less than $50,000 and interest is payable at 8.0% per annum. The funds
will be repayable by no earlier than 31 December 2024
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(389)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(525)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(914)
8.4
Cash and cash equivalents at quarter end (item 4.6)
305
8.5
Unused finance facilities available at quarter end (item 7.5)
500
8.6
Total available funding (item 8.4 + item 8.5)
805
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.9
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No, the previous quarter's expenditure ($914,000) included a $145,000 one off
yearly payment for Mining Rehabilitation Fund Levy and $235,000 of yearly rental
payments for tenements which is not representative for future quarters, and as such
expenditure in the short-term is likely to be reduced significantly.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The Company will seek to raise equity funds, undertake further borrowings, or sell
non-core assets if required. It is expected that the Company will be successful in its
future fund-raising activities
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: The Company expects to continue its operations and meet its business objectives
via its existing funds and future fund raising when required.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
21 October 2024
Authorised by: By the Board
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.