Managing Director's AGM Presentation
Released
Released
Announcement PDF
horizongold.com.au
Gum Creek Gold Project
ASX: HRN
AGM Presentation
20 November 2025
IMPORTANT NOTICE AND DISCLAIMER
No New Information or Data
This presentation contains references to exploration results and Resource estimates, all of which have been cross referenced to previous market announcements made by the
Company. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in
the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed.
This presentation contains references to forecast financial information extracted from the Company's announcement titled “Compelling Gum Creek Scoping Study “ dated 20 March
2024. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original announcement, all material assumptions
and technical parameters underpinning the forecast financial information derived from the Scoping Study and included in the original announcement continue to apply and have not
materially changed.
Cautionary Statement
The mine production target and forecast financial information referred to in the Gum Creek Scoping Study includes Indicated Mineral Resources (approximately 76%) and Inferred
Mineral Resources (approximately 24%). The Inferred material does not have a material effect on the technical and economic viability of the Gum Creek Gold Project. There is a low
level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
Forward Looking Statements
This presentation may contain certain “forward-looking statements” which may not have been based solely on historical facts but rather may be based on the Company’s current
expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed
in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors, which could cause
actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to metals price
volatility, currency fluctuations, as well as political and operational risks and governmental regulation and judicial outcomes.
Competent Persons Statement
The information in this presentation that relates to exploration results and Mineral Resources is based on information compiled by Mr Leigh Ryan, who is a member of The
Australasian Institute of Geoscientists. Mr Ryan is the Managing Director of Horizon Gold Limited and holds shares and options in the Company, Mr Ryan has sufficient experience,
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Ryan consents to the inclusion in the presentation of the
matters based on information provided in the form and context in which it appears.
EXECUTIVE SUMMARY
3
Large-scale, High-Grade Asset with Low Mining Recommencement Risk
▪ 37.97Mt @ 1.89g/t Au for 2.30Moz (71% indicated) on granted mining leases across 26 deposits, 70% free-milling gold with > 90% recoveries
▪ Two large mineralised systems including Gidgee Shear zone (1.05Moz @ 2.17g/t) and Howards (245koz @ 1.11g/t) underpinning base mill feed
Material exploration upside targeting higher grade intersections
▪ Significantly underexplored 80km-long project strike with low discovery cost, focused on open pittable and high-grade underground resources
▪ Drilling underway at Kingfisher – stacked lodes plunging to the south, with better grades at depth including 15m @ 28.5g/t Au, 10m @ 8.9g/t Au
▪ Omega – targeting depth extensions of historical intersections, including 30m @ 21.1g/t Au, 13m @ 10.8g/t Au, 10m @ 10.4g/t Au
Feasibility Study due in 1HCY26
▪ Positive Scoping Study confirmed standalone operation potential @ A$2,900/oz.
▪ All key workstreams on track for H1-2026 Feasibility completion, focused on shallow, free milling open pittable feed from the Gidgee Shear Zone
and Howards area
Resources On Existing Mining Leases and Established Infrastructure Supports Rapid Restart
▪ Planned central mill to be located at the historically permitted Gidgee site. Large resources located on existing mining leases provide streamlined
pathway to production. Existing haul roads, ROM pad, camp and tailings infrastructure reduce development timelines and capex intensity
▪ Located in a prolific WA gold district with nearby consolidation opportunities (Brightstar Resources, Aurumin, Gateway Resources, Neometals)
Experienced Board and Technical Team
▪ Led by seasoned mining executives with deep exploration, development, and corporate experience
High-quality gold asset in a tier-1 mining jurisdiction
GUM CREEK GOLD PROJECT
Gum Creek Gold Project
4
▪ Largest gold resource (2.30 Moz* – 71% Indicated) in the Sandstone District, with significant
exploration upside and potential consolidation opportunities
▪ Well-endowed gold region – the GCGP has historically produced more than 1.1 Moz** with last
mining in 2005 when gold price was A$560/oz
▪ Compelling standalone free milling gold development opportunity on granted mining leases,
providing a streamlined permitting process
▪ Feasibility Study (FS) progressing following very positive Scoping Study; FS is focused on the
Gidgee Shear Zone and Howards resource areas (81% of free milling MRE ounces)
▪ Planned central mill facility at established operating site, serviced with well maintained gravel
roads, existing haul roads, tailings facility ROM pad, camp and other infrastructure
▪ Ongoing exploration targeting higher grade feed and resource growth
Mineral Resource Estimate *
Resource
Tonnes Grade Contained
Mt g/t Au Moz Au
Indicated 26.7 1.90 1.63
Inferred 11.3 1.86 0.67
Total 38.0 1.89 2.30
Source: * Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Resource Update" dated 4 November 2025.
** Refer to Horizon Gold Limited ASX Announcement titled “Horizon Gold Limited Prospectus” dated 19 December 2016.
Gidgee Shear Zone
5
Main free milling ore source underpinning mine life and economics adjacent to Gidgee Mill
▪ +7km long mineralised system hosting 1.05Moz* (66% Indicated) adjacent to the Gidgee mill
▪ Sub-parallel shears up to 60m wide; mineralisation open along strike and down plunge at all deposits
▪ Potential to expand the open cut and underground gold resources (majority of drilling <100m)
Wedge
Swift
Swan
Eagle
Kingfisher
Hawk
Source: * Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Resource Update" dated 4 November 2025 for further information.
3D view of Main Gidgee Mining Area looking down to the northeast showing A$2,900 optimised pit shells (blue), existing haul roads (red) and MRE block models (coloured by Au g/t)
Proposed
Plant Site
Howards Deposit
6
2nd bulk tonnage free milling deposit underpinning mine life and economics
▪ 2.5km long mineralised zone hosting 245koz* (90% Indicated), 27km SE of the Gidgee mill
▪ No previous mining, gold mineralisation at surface up to 50m wide
▪ Low strip ratio underpins economics
▪ Potential to increase the gold resource at shallow depths along strike to the north and south
Howards
Source: * Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Project Resource Update" dated 4 November 2025.
Refer to Horizon Gold Limited ASX announcement titled “Impressive broad, shallow and high-grade intercepts returned from RC and Diamond Drilling” dated 3 June 2025 for intercept information.
3D view of Howards looking down to the NE showing A$2,900 optimised pit shells (blue) and MRE block model (coloured by Au g/t)
Exploration Upside
7
Resource Upside
▪ Excellent brownfields resource upside across the 80km strike of Gum Creek Gold Project
▪ Excellent recent assay results from infill and extension resource drilling included:
▪ Swan/Swift Prospects: 22m @ 3.18g/t Au from 2m including 5m @ 9.71g/t Au from 10m*
▪ Howards Prospect: 28m @ 3.88g/t Au from 74m including 12m @ 8.19g/t Au from 77m*
▪ Eagle Prospect: 14m @ 4.34g/t Au from 24m including 3m @ 18.66g/t Au from 32m**
▪ Results from 4,400m of resource extension RC drilling are pending
▪ Further drilling at numerous untested resource targets in planning
▪ Diamond drilling at Kingfisher and Omega high-grade underground targets is underway
Continuous Resource Growth*** (Moz Au)
Source: * Refer to Horizon Gold Limited ASX Announcement titled “Impressive broad, shallow and high-grade intercepts returned from RC and Diamond Drilling" dated 3 June 2025.
** Refer to Horizon Gold Limited ASX Announcement titled “Additional impressive high-grade intercepts returned from RC and Diamond Drilling” dated 30 June 2025.
*** Refer to Horizon Gold Limited ASX announcements titled “Gum Creek Gold Project Resource Update” dated 12 February 2021, “32% Increase in Resources at Gum Creek Gold Project” dated 25 July
2022, “19% Increase in Gold Resources at Gum Creek Project” dated 15 May 2023 & “Gum Creek Project Resource Update" dated 4 November 2025.
0.99 1.15 1.35
1.63
0.37
0.64
0.79
0.67
0.00
0.50
1.00
1.50
2.00
2.50
February 2021 July 2022 May 2023 November 2025
Indicated
Inferred
1.36
1.79
2.14
2.30
Swan Underground Potential
8
Largest free milling high-grade
underground resource
Source: * Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Resource Update" dated 4 November 2025 for further information.
** Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Geological Review” dated 15 February 2021 & “Significant RC Drilling Results from Swift, Swan and Eagle Targets” dated 16 June
2021 for drilling intercept information.
Long section of Swan deposit showing A$2,900 optimised pit shells (blue), >50GxM unmined intercepts, interpreted high-grade gold shoots
and existing underground workings**
▪ Swan Underground MRE reported as 1.73Mt @
4.19g/t Au for 233,700 ounces (57% Indicated)*
▪ Moderate NE dipping and shallow SE dipping
conjugate vein sets emanating from the broader
north-south steeply dipping shear zone (Gidgee
Shear)
▪ Significant amount of unmined high-grade shoots
near existing underground mining infrastructure
Gidgee Shear Zone – Kingfisher Deposit
9
▪ High-Grade Historical Production: Between
1990 and 1996, the Kingfisher deposit yielded
265koz of gold from open-pit operations at an
average grade of 4.0g/t and 27koz from
underground mining at an impressive 14.1g/t
▪ Substantial Existing Resource: The current
MRE for Kingfisher stands at 2.26Mt @
2.65g/t, totalling 192.4koz*
▪ Strategic Location: Situated approximately
3.5 km south of the Gidgee Mill, the Kingfisher
deposit benefits from proximity to existing
infrastructure, reducing potential development
costs
▪ Open-Ended Mineralisation: The deposit
features a 1.2 km strike length with
mineralisation remaining open along strike and
at depth, suggesting significant potential for
resource expansion
▪ Recent High-Grade Drill Intercepts:
Exploration has returned exceptional results,
including 15m @ 28.5g/t from 346m and 10m
@ 8.9g/t from 190m**, indicating the presence
of high-grade zones at depth
▪ Drilling planned to test for better grades down
plunge at depth
Source: * Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Project Resource Update" dated 4 November 2025.
**Refer to Horizon Gold Limited ASX announcement titled “Diamond drilling returns 15m @ 28.5g/t Au from Kingfisher" dated 12 December 2022.
Historical production data has been sourced from: Hazard N J 1998 - Kingfisher gold deposit, Gidgee: in Berkman D A, Mackenzie D H (Ed.s), 1998 Geology of Australian & Papua New Guinean Mineral
Deposits The AusIMM, Melbourne Mono 22 pp 123-126
Permitted, High-Grade Deposit Near Mill with Proven Production History, and significant exploration potential
Omega Exploration Potential
10
▪ High-Grade Production History: Omega Pit
previously produced 44koz @ 5.4g/t, while the
Omega Underground delivered 40koz @ 5.3g/t,
demonstrating consistent high-grade mineralisation
across previous mining phases
▪ Drilling planned at Omega to follow up historical
drilling intercepts not mined
▪ Omega down-plunge extensions including:
▪ 30m @ 21.1g/t Au from 57m
▪ 13m @ 10.8g/t Au from 122m
▪ 24m @ 6.1g/t Au from 50m
▪ 10m @ 10.4g/t Au from 127m
▪ 14m @ 7.1g/t Au from 112m
▪ 22m @ 3.7g/t Au from 76m
Source: Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Geological Review” dated 15 February 2021 for drilling intercept information. Historical production data has been sourced from: Ross, D I
and Smith, D W, 1998. Omega gold deposit, Gidgee, in Geology of Australian and Papua New Guinean Mineral Deposits (Eds: D A Berkman and D H Mackenzie), pp 119–122 (The Australasian Institute of Mining
and Metallurgy: Melbourne).
High-grade exploration potential
Wilsons – High Grade U/G Optionality
11
▪ Large, High-Grade Sulphide Resource Not Yet in Development Plan: Wilsons hosts a 400koz
resource @ 4.31g/t (97% Indicated)*, offering a significant inventory of high-grade gold not currently
included in the Scoping or Feasibility Studies.
▪ Outstanding Historical Intercepts Indicate Depth Continuity: Historical diamond drilling has returned
strong down-plunge results, supporting the view that mineralisation continues at depth and may be
expanded with further drilling.
▪ Metallurgy Well Understood: Test work has delivered strong gold recoveries of 87–90%, with
conventional processing routes for refractory ore applicable (Albion process). This supports the
optionality to integrate Wilsons into the Gum Creek development or toll treating at a later stage.
▪ Permitting Advantage: Like the broader project resources, Wilsons sits on granted mining leases, with
a history of exploration and development that streamlines future permitting or restart pathways.
Source: * Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Project Resource Update" dated 4 November 2025.
Refer to Panoramic Resources Limited ASX Announcements titled “Corporate Strategy and positive gold results” dated 27 June 2016 for metallurgy information & titled “Quarterly Report for the period ending
30 September 2013” dated 21 October 2013 for cross section information
Permitted, High-Grade Resource to Extend Mine Life
March 2024 Scoping Study – attractive base case economics
Key Economic Metrics
12
Life of Mine Years 10
Gold Price A$/oz 3,300
Pre-production Capital Costs A$m 239
LoM Capital Costs A$m 333
Annual Gold Production koz p.a 84
LoM Gold Production koz 888
Payback Period Years 2.1
LoM EBITDA A$m 904
AISC A$/oz 1,931
Cashflow and Cumulative Cashflow p.a. (A$m @ A$3300/oz)
Source: Refer to Horizon Gold Limited ASX announcement titled “Compelling Gum Creek Scoping Study” dated 20 March 2024. The mining production target and forecast financial information referred to in the
Gum Creek Scoping Study includes Indicated Mineral Resources (approximately 76%) and Inferred Mineral Resources (approximately 24%). The Inferred material does not have a material effect on the technical
and economic viability of the Gum Creek Gold Project. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in
the determination of Indicated Mineral Resources or that the production target itself will be realised.
$(400.00)
$(200.00)
$-
$200.00
$400.00
$600.00
$800.00
$1,000.00
0 1 2 3 4 5 6 7 8 9 10 11
Cashflow Cumulative Cashflow
Feasibility Study on track for completion 1H 2026
13
Targeting simple base-case operation underpinned by two open pit mining areas, the Gidgee Shear Zone and Howards open pit
▪ Mine plan only includes 7 of the 26 resource areas (81% of the free milling resource)
▪ All gold resources in the Study are located on granted mining leases within the 100% owned Gum Creek Gold Project
Key workstreams
▪ Feasibility resource drilling and geotechnical drilling completed with results announced
▪ MRE update completed
▪ Geotechnical, geochemical and metallurgical test work completed - reports being finalised
▪ Process plant design, mine layout, waste rock dump and pit designs completed
▪ Mining schedule being finalised
▪ Water bore drilling completed, groundwater model completed, water balance model and surface water infrastructure designs being finalised
▪ Power study completed and environmental surveys completed - reports being finalised
▪ Heritage surveys completed and consent to mine received - reports being finalised
▪ Completion of the Feasibility Study on track for completion 1H CY2026
Open Pit Mining of Free Milling Resources on Granted Mining Leases
CORPORATE OVERVIEW
14
Capitalisation Summary * Shareholder Summary
12 Month Share Price and Trading Volumes* Key Board and Management
Notes: * As at 19 November 2025
Unit ASX:HRN
Share Price A$ 0.73
Shares Outstanding M 169.6
Market Capitalisation A$m 123.8
Cash (30 September 2025) A$m 8.2
Debt (30 September 2025) A$m 0
Enterprise Value A$m 115.6
Peter Sullivan
Executive Chairman
• Over 30+ years of experience in the resources sector across project
engineering, corporate finance and public company directorships
• Previous directorships in Zeta Resources and Alliance Nickel
Leigh Ryan
Managing Director
• Qualified geologist with 30+ years of experience across Australia and
Africa
• Previously held senior leadership roles at Resolute Mining, Boss
Resources, Chrysalis Resources and Alchemy Resources
$-
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
$0.70
$0.80
$0.90
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
18-Nov-24 18-Jan-25 18-Mar-25 18-May-25 18-Jul-25 18-Sep-25
Volume (M)
Share Price
Zeta Resources
Directors &
Management
Other Shareholders
horizongold.com.au
APPENDICES
Gum Creek Gold Project Location
Gum Creek Gold Project
16
▪ Strategic project within the prolific Sandstone / Gum
Creek gold mining district located between the gold
mining townships of Meekatharra, Wiluna and
Sandstone
▪ Gum Creek Gold Project has one of the largest
landholdings in the district and the largest resource at
2.3Moz Au.
▪ Strategically located - 6 gold mills within 150km of the
project
GUM CREEK GOLD PROJECT RESOURCE 1,2
17
Source: (1) Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Resource Update" dated 4 November 2025 for more information. (2) Figures are rounded.
* cut-off grades are 1.5g/t Au for Swan UG, Swift UG, Wilsons UG and Kingfisher UG.
** Wyooda includes the Kingston Town, Think Big and Manikato resources.
Resource Resource Date
Cut-off
grade (g/t
Au)
Indicated Inferred Total
Tonnes Au (g/t) Gold (oz) Tonnes Au (g/t) Gold (oz) Tonnes Au (g/t) Gold (oz)
Swan/Swift OC Nov-25 0.4 6,661,000 1.86 399,000 335,000 1.54 16,600 6,996,000 1.85 415,600
Swan UG* Nov-25 1.5 935,000 4.45 133,700 798,000 3.90 100,000 1,733,000 4.19 233,700
Swift UG* Nov-25 1.5 35,000 2.22 2,500 813,000 2.54 66,300 848,000 2.52 68,800
Wilsons UG* Nov-25 1.5 2,759,000 4.37 387,400 126,000 3.16 12,800 2,885,000 4.31 400,200
Howards Nov-25 0.4 6,095,000 1.13 221,800 751,000 0.97 23,500 6,846,000 1.11 245,300
Kingfisher OC Nov-25 0.6 1,139,000 2.05 75,100 79,000 1.50 3,800 1,218,000 2.01 78,900
Kingfisher UG* Nov-25 1.5 94,000 2.71 8,200 949,000 3.45 105,300 1,043,000 3.38 113,500
Heron May-23 0.6 330,000 2.11 22,400 1,822,000 1.51 88,200 2,152,000 1.60 110,600
Eagle Nov-25 0.4 817,000 1.27 33,400 1,202,000 1.29 50,000 2,019,000 1.28 83,400
Heron South May-23 0.8 720,000 1.79 41,400 761,000 1.53 37,500 1,481,000 1.66 78,900
Shiraz Nov-25 0.4 1,947,000 1.04 65,400 372,000 0.94 11,200 2,319,000 1.03 76,600
Wyooda** Nov-25 0.8 557,000 1.54 27,500 718,000 1.56 36,100 1,275,000 1.55 63,600
Snook Jul-22 0.8 75,000 2.57 6,200 846,000 1.76 47,800 921,000 1.82 54,000
Toedter Nov-25 0.6 905,000 1.31 38,200 99,000 1.32 4,200 1,004,000 1.31 42,400
Hawk Nov-25 0.6 591,000 1.38 26,200 167,000 1.27 6,800 758,000 1.35 33,000
Specimen Well Nov-25 0.6 431,000 1.49 20,600 114,000 1.31 4,800 545,000 1.45 25,400
Wedge Nov-25 0.6 427,000 1.42 19,500 56,000 2.83 5,100 483,000 1.58 24,600
Camel Bore Jul-22 0.8 379,000 1.47 17,900 100,000 1.21 3,900 479,000 1.42 21,800
Melbourne Bitter Nov-25 0.6 318,000 1.46 14,900 157,000 1.27 6,400 475,000 1.39 21,300
Hyperno-Reliance Nov-25 0.6 295,000 1.52 14,400 183,000 1.02 6,000 478,000 1.33 20,400
Kearrys May-23 0.6 450,000 1.24 18,000 46,000 1.35 2,000 496,000 1.25 20,000
Psi Jul-22 0.8 100,000 2.08 6,700 226,000 1.69 12,300 326,000 1.81 19,000
Deep South Reliance Nov-25 0.6 229,000 1.53 11,300 17,000 0.91 500 246,000 1.49 11,800
Orion Jul-22 0.8 69,000 1.49 3,300 182,000 1.40 8,200 251,000 1.43 11,500
Eagles Peak May-23 0.6 264,000 1.19 10,100 41,000 0.99 1,300 305,000 1.16 11,400
Wahoo Jul-22 0.8 - - - 258,000 1.25 10,400 258,000 1.25 10,400
Fangio May-23 0.6 99,000 1.32 4,200 30,000 1.35 1,300 129,000 1.33 5,500
Total 26,721,000 1.90 1,629,300 11,248,000 1.86 672,300 37,969,000 1.89 2,301,600
Peter Sullivan
Executive Chairman
Leigh Ryan
Managing Director
+61 8 6331 6092
info@horizongold.com.au
horizongold.com.au
Unit 8 / 47 Havelock St.
West Perth, WA 6005
ASX: HRN
18
Haul Road to the Gidgee Mill
CONTACT DETAILS
Share your feedback
Discover