1
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED
31 DECEMBER 2025
Key Points
Updated Gum Creek Gold Project Mineral Resource Estimate (MRE) of 37.97Mt @ 1.89g/t Au for
2.30Moz represents an 8% increase in total ounces and a 26% increase in gold grade when
compared with the May 2023 MRE.
Indicated gold resource is 26.72Mt @ 1.90g/t Au for 1.63Moz representing a 21% increase in
Indicated ounces compared to the May 2023 MRE and now representing 71% of the total MRE.
Free milling portion of the resource estimate is 28.64Mt @ 1.74g/t Au for 1.60Moz, representing
70% of the total MRE ounces.
All resource areas are located on granted mining leases and remain open along strike or at depth
showing strong potential for additional resource growth with further drilling.
Significant shallow intercepts returned from RC resource expansion drilling at Goldfinch and Robin
Prospects included:
Goldfinch Prospect:
11m @ 3.18g/t Au from 84m including 5m @ 6.41g/t Au from 85m
7m @ 3.63g/t Au from 35m including 1m @ 22.4g/t Au from 36m
11m @ 2.21g/t Au from 70m including 4m @ 4.52g/t Au from 72m
15m @ 1.55g/t Au from 24m including 6m @ 2.10g/t Au from 28m
18m @ 1.05g/t Au from 83m
2m @ 7.42g/t Au from 73m
2m @ 7.39g/t Au from 4m
Robin Prospect:
7m @ 2.46g/t Au from 27m including 2m @ 7.61g/t Au from 30m
Drilling aimed at testing high priority targets down plunge of previous high grade drill intercepts
including 15m @ 28.5g/t Au from 346m and 10m @ 8.9g/t Au from 190m at Kingfisher has been
completed. Final assay results are pending.
Diamond drilling at Omega aimed at testing the down-plunge extensions to previous high grade
drill intercepts including 30m @ 21.1g/t Au from 57m and 13m @ 10.8g/t Au from 122m is
underway with 1 hole completed to date. All assays are pending.
Work on the Gum Creek Feasibility Study is progressing well and remains on schedule for
completion H1 CY 2026
________________________________________________________________________________
2
Horizon Gold Limited (ASX: HRN) (Horizon or the Company) is focussed on progressing its
exploration and development activities at the 100%-owned Gum Creek Gold Project (Gum Creek or
the Project) located in the Mid-West Region of Western Australia (Figure 1). Gum Creek has
historically produced more than 1 million ounces of gold and currently hosts a recently updated gold
resource of 37.97Mt @ 1.89g/t Au for 2.30 million ounces1
. The Project currently covers 644km2
of
granted tenure over the highly prospective and underexplored Gum Creek greenstone belt, which
contains 37 open pit and three underground gold mines.
During the quarter the Company completed an update to the Gum Creek Mineral Resource Estimate,
received results from further resource expansion drilling, completed deep diamond drilling at the
Kingfisher Prospect, commenced diamond drilling at the Omega Prospect, and advanced the Gum
Creek Feasibility Study, which remains on schedule for completion H1 CY 2026.
Figure 1: Gum Creek Gold Project and surrounding gold resources and operating gold processing facilities.
1
Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Gold Resource Update” dated 4 November 2025.
3
Updated Gum Creek Gold Project MRE
A revised Gum Creek MRE of 37.97Mt @ 1.89g/t Au for 2.30Moz2
was released during the quarter.
The resource represents an 8% increase in total ounces and a 26% increase in gold grade when
compared with the May 2023 MRE. The Indicated gold resource is 26.72Mt @ 1.90g/t Au for
1.63Moz representing a 21% increase in ounces from the May 2023 MRE and 71% of the total MRE.
The free milling portion of the resource estimate is 28.64Mt @ 1.74g/t Au for 1.60Moz representing
70% of the total MRE ounces. The updated resource is summarised in Table A and broken down by
material type and metallurgical categories in Tables B and C. Table D compares the current and
previous MRE’s by resource category, and the location of each resource is shown in Figure 2.
The Company considers the MRE to have a reasonable prospect for eventual economic extraction
(RPEEE) based on the comparison of gold resource tonnes, thickness, and grades of the deposits for
open pit and underground mining operations on granted mining leases in similar mining jurisdictions to
that of Western Australia.
Table A: Gum Creek Gold Resources as at 4 November 2025
Resource
Resource
Date
Cut-off
grade
(g/t Au)
Indicated Inferred Total
Tonnes
Au
(g/t)
Gold (oz) Tonnes
Au
(g/t)
Gold
(oz)
Tonnes
Au
(g/t)
Gold (oz)
Swan/Swift OC Nov-25 0.4 6,661,000 1.86 399,000 335,000 1.54 16,600 6,996,000 1.85 415,600
Swan UG* Nov-25 1.5 935,000 4.45 133,700 798,000 3.90 100,000 1,733,000 4.19 233,700
Swift UG* Nov-25 1.5 35,000 2.22 2,500 813,000 2.54 66,300 848,000 2.52 68,800
Wilsons UG* Nov-25 1.5 2,759,000 4.37 387,400 126,000 3.16 12,800 2,885,000 4.31 400,200
Howards Nov-25 0.4 6,095,000 1.13 221,800 751,000 0.97 23,500 6,846,000 1.11 245,300
Kingfisher OC Nov-25 0.6 1,139,000 2.05 75,100 79,000 1.50 3,800 1,218,000 2.01 78,900
Kingfisher UG* Nov-25 1.5 94,000 2.71 8,200 949,000 3.45 105,300 1,043,000 3.38 113,500
Heron May-23 0.6 330,000 2.11 22,400 1,822,000 1.51 88,200 2,152,000 1.60 110,600
Eagle Nov-25 0.4 817,000 1.27 33,400 1,202,000 1.29 50,000 2,019,000 1.28 83,400
Heron South May-23 0.8 720,000 1.79 41,400 761,000 1.53 37,500 1,481,000 1.66 78,900
Shiraz Nov-25 0.4 1,947,000 1.04 65,400 372,000 0.94 11,200 2,319,000 1.03 76,600
Wyooda** Nov-25 0.8 557,000 1.54 27,500 718,000 1.56 36,100 1,275,000 1.55 63,600
Snook Jul-22 0.8 75,000 2.57 6,200 846,000 1.76 47,800 921,000 1.82 54,000
Toedter Nov-25 0.6 905,000 1.31 38,200 99,000 1.32 4,200 1,004,000 1.31 42,400
Hawk Nov-25 0.6 591,000 1.38 26,200 167,000 1.27 6,800 758,000 1.35 33,000
Specimen Well Nov-25 0.6 431,000 1.49 20,600 114,000 1.31 4,800 545,000 1.45 25,400
Wedge Nov-25 0.6 427,000 1.42 19,500 56,000 2.83 5,100 483,000 1.58 24,600
Camel Bore Jul-22 0.8 379,000 1.47 17,900 100,000 1.21 3,900 479,000 1.42 21,800
Melbourne Bitter Nov-25 0.6 318,000 1.46 14,900 157,000 1.27 6,400 475,000 1.39 21,300
Hyperno-Reliance Nov-25 0.6 295,000 1.52 14,400 183,000 1.02 6,000 478,000 1.33 20,400
Kearrys May-23 0.6 450,000 1.24 18,000 46,000 1.35 2,000 496,000 1.25 20,000
Psi Jul-22 0.8 100,000 2.08 6,700 226,000 1.69 12,300 326,000 1.81 19,000
Deep South
Reliance
Nov-25 0.6 229,000 1.53 11,300 17,000 0.91 500 246,000 1.49 11,800
Orion Jul-22 0.8 69,000 1.49 3,300 182,000 1.40 8,200 251,000 1.43 11,500
Eagles Peak May-23 0.6 264,000 1.19 10,100 41,000 0.99 1,300 305,000 1.16 11,400
Wahoo Jul-22 0.8 - - - 258,000 1.25 10,400 258,000 1.25 10,400
Fangio May-23 0.6 99,000 1.32 4,200 30,000 1.35 1,300 129,000 1.33 5,500
Total 26,721,000 1.90 1,629,300 11,248,000 1.86 672,300 37,969,000 1.89 2,301,600
* Cut-off grades for Swan, Swift, Wilsons and Kingfisher underground Indicated and Inferred are 1.5g/t Au.
** Wyooda includes the Kingston Town, Think Big and Manikato resources which are within 600m and 200m of each other respectively.
Note: Figures have been rounded.
2 Refer to Horizon Gold Limited ASX Announcement titled “Gum Creek Project Gold Resource Update” dated 4 November 2025.
4
The information in this announcement that relates to the reporting of the Kingston Town, Manikato, Snook, Camel Bore, Psi, Orion, and
Wahoo Mineral Resources has been extracted from the Horizon Gold Limited ASX announcement titled “32% Increase in Resources at
Gum Creek Gold Project” dated 25 July 2022 and is available to view on https://horizongold.com.au.
The information in this announcement that relates to the reporting of the Heron, Heron South, Kearrys, Eagles Peak and Fangio Mineral
Resources has been extracted from the Horizon Gold Limited ASX announcement titled “19% Increase in Gold Resources at Gum Creek
Project” dated 15 May 2023 and is available to view on https://horizongold.com.au.
Table B: Gum Creek Mineral Resources by Material Type as at 4 November 2025
Material Type
Indicated Inferred Total
Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces
Oxide 7,137,000 1.41 323,000 2,217,000 1.30 92,800 9,354,000 1.38 415,800
Transition 5,424,000 1.57 273,300 2,184,000 1.46 102,700 7,608,000 1.54 376,000
Fresh 14,160,000 2.27 1,033,000 6,847,000 2.17 476,800 21,007,000 2.24 1,509,800
Total 26,721,000 1.90 1,629,300 11,248,000 1.86 672,300 37,969,000 1.89 2,301,600
Note: Figures have been rounded.
Table C: Gum Creek Mineral Resources by Metallurgical Category as at 4 November 2025
Material Type
Indicated Inferred Total
Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces
Free Milling 21,229,000 1.65 1,126,600 7,408,000 2.00 477,000 28,637,000 1.74 1,603,600
Refractory 5,492,000 2.85 502,700 3,840,000 1.58 195,300 9,332,000 2.33 698,000
Total 26,721,000 1.90 1,629,300 11,248,000 1.86 672,300 37,969,000 1.89 2,301,600
Notes: Figures have been rounded. Metallurgical test work indicates oxide mineralisation at all deposits is free milling, transition
mineralisation from Swan/Swift, Howards, Kingfisher, Eagle, Kingston Town, Think Big, Hawk, Toedter, Wedge, Specimen Well, Kearrys,
Hyperno-Reliance, Melbourne Bitter, Deep South Reliance, Eagles Peak, Orion, Wahoo, and Fangio is free milling, and fresh
mineralisation from Swan/Swift, Howards, Kingfisher, Eagle, Hawk, Toedter, Wedge, Hyperno-Reliance, Melbourne Bitter, Deep South
Reliance, Eagles Peak, Orion, and Wahoo is free milling. Due to the presence of pyrrhotite affecting oxygen and cyanide consumption,
transition mineralisation from Psi and fresh material from Psi, Kearrys and Fangio has variable gold recoveries >85% and are classified
as “low recovery ore” however this ore has been included in the free milling category. Transition mineralisation from Wilsons, Heron,
Shiraz, Manikato, Heron South, Snook, and Camel Bore, and fresh mineralisation from Wilsons, Heron, Shiraz, Kingston Town, Manikato,
Think Big, Heron South, Snook, Camel Bore and Specimen Well have variable gold recoveries associated with arsenopyrite and are
classified as refractory.
Table D: Gum Creek Mineral Resources May 2023 / 4 November 2025 Comparison
Resource
Category
2023 Gum Creek MRE 2025 Gum Creek MRE Variance
Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces Tonnes Au (g/t) Ounces
Indicated 28,193,000 1.48 1,346,000 26,721,000 1.90 1,629,300 -5% 28% 21%
Inferred 16,257,000 1.51 791,300 11,248,000 1.86 672,300 -31% 23% -15%
Total 44,450,000 1.50 2,137,300 37,969,000 1.89 2,301,600 -15% 26% 8%
Note: Figures have been rounded.
5
Figure 2: Gum Creek Gold Project Mineral Resources, Advanced Mineral Resource Targets and
Exploration Targets over simplified geology
6
Goldfinch Prospect
During the quarter the Company completed 31 RC holes for 2,415m at the Goldfinch Prospect located
2km south-southeast of the old Gidgee Mill. Assay results confirmed previously identified shallow gold
mineralisation striking north-northwest and dipping moderately to the southwest. Drilling returned the
following significant gold intercepts3
(Figure 3):
11m @ 3.18g/t Au from 84m including 5m @ 6.41g/t Au from 85m (GFRC029)
7m @ 3.63g/t Au from 35m including 1m @ 22.4g/t Au from 36m (GFRC007)
11m @ 2.21g/t Au from 70m including 4m @ 4.52g/t Au from 72m (GFRC021)
15m @ 1.55g/t Au from 24m including 6m @ 2.10g/t Au from 28m (GFRC015)
18m @ 1.05g/t Au from 83m (GFRC031)
2m @ 7.42g/t Au from 73m (GFRC030)
2m @ 7.39g/t Au from 4m (GFRC003)
10m @ 1.06g/t Au from 75m including 3m @ 2.94g/t Au from 78m (GFRC017)
5m @ 2.09g/t Au from 6m including 1m @ 6.24g/t Au from 10m (GFRC028)
4m @ 2.60g/t Au from 29m including 2m @ 4.58g/t Au from 29m (GFRC019)
Additional drilling along strike to the north and down dip is required.
Figure 3: Goldfinch and Toucan Prospects drill hole location plan showing historic
holes coloured by max. downhole gold, and recent drill hole traces (white) and
selected recent gold intercepts >2.5 GxM labelled over satellite image.
3 Refer to Horizon Gold Limited ASX Announcement titled “Impressive shallow gold intercepts returned from RC drilling” dated 1 December
2025.
7
Robin Prospect
Seven RC holes for 585m were drilled at the Robin Prospect located 2km southeast of the old Gidgee
Mill. Assay results confirmed shallow flat lying supergene gold mineralisation extending to the south of
the Robin open pit. Drilling returned the following significant gold intercepts (Figure 4):
7m @ 2.46g/t Au from 27m including 2m @ 7.61g/t Au from 30m (RORC001)
6m @ 0.92g/t Au from 59m including 1m @ 3.67g/t Au from 64m (RORC003)
Figure 4: Robin Prospect drill hole location plan showing historic
holes coloured by max. downhole gold and recent drill hole traces
(white) with gold intercepts (labelled) over satellite image.
Thornbill West Prospect
The Company completed nine RC holes for 702m at the Thornbill West Prospect located 1.6km
southeast of the old Gidgee Mill. Assay results identified gold mineralisation extending to the north of
the prospect where further drilling is required. Drilling returned the following significant gold intercepts
(Figure 5):
2m @ 1.53g/t Au from 23m (THRC001)
9m @ 0.64g/t Au from 2m (THRC001)
9m @ 0.28g/t Au from 35m (THRC004)
8
Figure 5: Thornbill Prospect drill hole location plan showing historic
holes coloured by max. downhole gold and recent drill hole traces
(white) and recent gold intercepts (labelled) over satellite image.
Toucan Prospect
Eight RC holes for 650m were drilled at the Toucan Prospect located 2.6km southeast of the old Gidgee
Mill. Drilling returned a best intercept of 1m @ 2.57g/t Au from 32m (TORC003) and failed to confirm
northern or southern extensions to gold mineralisation (Figure 3). No further drilling is warranted at
Toucan.
Deep Diamond Drilling Progress
Deep diamond drilling aimed at testing high priority targets down plunge of existing high-grade drill
intercepts at Kingfisher, including 15m @ 28.5g/t Au from 346m and 10m @ 8.9g/t Au from 190m4
has been completed. Final assay results are pending.
Diamond drilling at the Omega prospect has commenced with one hole completed to date. The
program is testing for potential mineralised extensions beneath impressive previous drill intercepts
including 30m @ 21.1g/t Au from 57m and 13m @ 10.8g/t Au from 122m5
. All assays are pending.
4 Refer to Horizon Gold Limited ASX announcements titled “Diamond drilling returns 15m @ 28.5g/t Au from Kingfisher" dated 12
December 2022 and “Outstanding gold intercepts returned from Gum Creek Diamond Drilling” dated 15 March 2022.
5 Refer to Horizon Gold Limited ASX announcement titled “Gum Creek Geological Review” dated 15 February 2021
9
Feasibility Study
The Company is focused on completing the free milling Feasibility Study and highlighting the potential
for developing a significant stand-alone gold operation at Gum Creek. Work on the Feasibility Study is
progressing well. Metallurgical, geotechnical, processing, waste rock, tailings and soil landform reports
have been received, all environmental and heritage surveys have been completed, surface water
infrastructure designs, pit and waste rock dump designs and mine infrastructure designs have been
completed, and water management plans and water balance modelling are almost complete. The
Study remains on schedule for completion H1 CY 2026.
AI-Assisted Mineral Discovery Platform (DORA)
During the quarter the Company also completed a first pass regional prospectivity analysis using
VRIFY’s proprietary AI-Assisted Mineral Discovery Platform, DORA. The exercise will help the
Company prioritise and validate high-potential targets and to ultimately accelerate growth of the
Project’s existing gold resource. Exploration target review and target field validation will be undertaken
in Q1 2026, and continuous data addition and target refinement will continue throughout 2026.
Corporate
Additional ASX Listing Rule Disclosures
As required by ASX Listing Rule 5.3, the Company advises it spent $3,586,000 on exploration and
evaluation activities during the quarter. The expenditure is predominantly related to costs associated
with resource drilling, resource estimation consultants, the Gum Creek Feasibility Study and ongoing
tenement rents and rates. There was no mining development or production activities conducted during
the quarter.
The total amount paid to directors of the entity and their related parties and associates (Section 6 of
Appendix 5B) was $137,000, encompassing the Managing Directors salary, Executive Director fees,
Non-Executive Directors’ fees and associated superannuation, and $41,000 relating to geological
drafting, database administration services and other services.
As at 31 December 2025, Horizon had a cash at hand balance of $4,112,000.
Mining Tenements
The status of the Company’s mining tenements as at 31 December 2025 are detailed in Appendix 1.
This ASX announcement was authorised for release by the Horizon Board.
For further information contact:
Leigh Ryan
Managing Director
+61 8 6331 6092
10
Competent Persons Statement:
The information that relates to Exploration Results in this announcement is based on information compiled by Mr Leigh Ryan,
who is a member of The Australasian Institute of Geoscientists. Mr Ryan is the Managing Director of Horizon Gold Limited
and holds shares and options in the Company, Mr Ryan has sufficient experience, which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Ryan consents to the inclusion in the report of the matters based on information provided in the form and
context in which it appears.
No New Information or Data:
This announcement contains references to Mineral Resource estimates, all of which have been cross referenced to previous
market announcements. The Company confirms that it is not aware of any additional information or data that materially affects
the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed.
Forward Looking Statements:
This ASX announcement may contain certain “forward-looking statements” which may not have been based solely on
historical facts but rather may be based on the Company’s current expectations about future events and results. Where the
Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed
in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties,
assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected
or implied by such forward-looking statements. Such risks include, but are not limited to metals price volatility, currency
fluctuations, as well as political and operational risks and governmental regulation and judicial outcomes.
11
APPENDIX 1:
(a) Horizon Group Mining Tenements held as at 31 December 2025
Lease Location
Area of
Interest Status Expiry Date Holder
Horizon's
Interest
Mineral
Rights
E51/1538 Gidgee Gum Creek Granted 03-Feb-26 GUM CREEK 100% All
E51/1844 Gidgee Gum Creek Granted 22-Jan-28 GUM CREEK 100% All
E51/2027 Gidgee Gum Creek Granted 09-Sep-26 GUM CREEK 100% All
E51/2028 Gidgee Gum Creek Granted 09-Sep-26 GUM CREEK 100% All
E53/1725 Gidgee Gum Creek Granted 03-Jul-27 GUM CREEK 100% All
E53/1955 Gidgee Gum Creek Granted 18-Jan-28 GUM CREEK 100% All
L51/93 Gidgee Gum Creek Granted 24-Nov-34 GUM CREEK 100% Infrastructure
L53/95 Gidgee Gum Creek Granted 13-Dec-28 GUM CREEK 100% Infrastructure
L53/96 Gidgee Gum Creek Granted 13-Dec-28 GUM CREEK 100% Infrastructure
L53/199 Gidgee Gum Creek Granted 29-Jul-36 GUM CREEK 100% Infrastructure
L57/20 Gidgee Gum Creek Granted 20-Jun-44 GUM CREEK 100% Infrastructure
L57/47 Gidgee Gum Creek Granted 13-Aug-34 GUM CREEK 100% Infrastructure
M51/104 Gidgee Gum Creek Granted 11-May-29 GUM CREEK 100% All
M51/105 Gidgee Gum Creek Granted 09-May-31 GUM CREEK 100% All
M51/157 Gidgee Gum Creek Granted 09-Mar-30 GUM CREEK 100% All
M51/185 Gidgee Gum Creek Granted 18-Feb-30 GUM CREEK 100% All
M51/186 Gidgee Gum Creek Granted 18-Feb-30 GUM CREEK 100% All
M51/290 Gidgee Gum Creek Granted 09-May-31 GUM CREEK 100% All
M51/410 Gidgee Gum Creek Granted 10-Mar-34 GUM CREEK 100% All
M51/458 Gidgee Gum Creek Granted 09-Feb-35 GUM CREEK 100% All
M53/10 Gidgee Gum Creek Granted 24-Nov-25 GUM CREEK 100% All
M53/11 Gidgee Gum Creek Granted 24-Nov-25 GUM CREEK 100% All
M53/105 Gidgee Gum Creek Granted 29-Aug-30 GUM CREEK 100% All
M53/153 Gidgee Gum Creek Granted 28-Jun-32 GUM CREEK 100% All
M53/251 Gidgee Gum Creek Granted 02-Sep-34 GUM CREEK 100% All
M53/500 Gidgee Gum Creek Granted 21-May-42 GUM CREEK 100% All
M53/716 Gidgee Gum Creek Granted 07-Sep-40 GUM CREEK 100% All
M53/904 Gidgee Gum Creek Granted 28-Sep-42 GUM CREEK 100% All
M53/988 Gidgee Gum Creek Granted 12-Mar-45 GUM CREEK 100% All
M57/634 Gidgee Gum Creek Granted 14-Jul-35 GUM CREEK 100% All
M57/635 Gidgee Gum Creek Granted 01-Sep-35 GUM CREEK 100% All
E53/2162 Gidgee Gum Creek Granted 07-Feb-27 GUM CREEK 100% All
E53/2168 Gidgee Gum Creek Granted 01-Mar-27 GUM CREEK 100% All
E57/1177 Gidgee Gum Creek Granted 30-Jun-27 GUM CREEK 100% All
P53/1702 Gidgee Gum Creek Granted 30-Sep-27 GUM CREEK 100% All
E57/1405 Gidgee Gum Creek Application N/A GUM CREEK 100% All
E57/1407 Gidgee Gum Creek Granted 13-Feb-30 GUM CREEK 100% All
E51/2203 Gidgee Gum Creek Application N/A GUM CREEK 100% All
E53/2321 Gidgee Gum Creek Granted 04-Dec-29 GUM CREEK 100% All
E57/1421 Gidgee Gum Creek Granted 17-Dec-29 GUM CREEK 100% All
L51/136 Gidgee Gum Creek Granted 07-Jan-46 GUM CREEK 100% Infrastructure
L53/307 Gidgee Gum Creek Granted 23-Jul-45 GUM CREEK 100% Infrastructure
L53/308 Gidgee Gum Creek Granted 23-Jul-45 GUM CREEK 100% Infrastructure
12
Lease Location
Area of
Interest Status Expiry Date Holder
Horizon's
Interest
Mineral
Rights
L53/310 Gidgee Gum Creek Application N/A GUM CREEK 100% Infrastructure
L57/71 Gidgee Gum Creek Granted 17-Sep-45 GUM CREEK 100% Infrastructure
L57/74 Gidgee Gum Creek Granted 31-Aug-46 GUM CREEK 100% Infrastructure
L57/75 Gidgee Gum Creek Granted 31-Aug-46 GUM CREEK 100% Infrastructure
L57/76 Gidgee Gum Creek Granted 01-Oct-46 GUM CREEK 100% Infrastructure
G57/12 Gidgee Gum Creek Application N/A GUM CREEK 100% Infrastructure
G57/13 Gidgee Gum Creek Application N/A GUM CREEK 100% Infrastructure
E57/1463 Gidgee Gum Creek Granted 04-Nov-30 GUM CREEK 100% All
E57/1464 Gidgee Gum Creek Granted 01-Jul-30 GUM CREEK 100% All
E = Exploration Licence (WA) M = Mining Lease (WA) P = Prospecting Licence (WA) L = Miscellaneous Licence (WA)
G = General Purpose Lease (WA)
Holder: GUM CREEK = Gum Creek Gold Mines Pty Ltd (100% Subsidiary of Horizon Gold Limited) * Renewal Application submitted
(b) Changes of Interest in mining tenements during the quarter
Tenement Reference and
Location
Nature of Interest Interest at beginning of Quarter Interest at end of Quarter
G57/13 Gidgee Application 0% 100%
L57/76 Gidgee Application Granted 100% 100%
E57/1463 Gidgee Application Granted 100% 100%
(c) Farm-in or farm-out changes during the Quarter
Tenement Reference and
Location
Nature of Interest Interest at beginning of Quarter Interest at end of Quarter
Nil
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
HORIZON GOLD LIMITED
ABN Quarter ended (“current quarter”)
27 614 175 923 31 DECEMBER 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
1. Cash flows from operating activities
25 29
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation (if expensed)
(b) development - -
(c) production - -
(d) staff costs (incl for Care & Maint.) (28) (54)
(e) direct site Care & Maint. costs - (7)
(f) administration and corporate costs (250) (551)
1.3 Dividends received (see note 3) - -
1.4 Interest received 55 102
1.5 Interest and other costs of finance paid (2) (2)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (WA State MRF payments) - (252)
1.9 Net cash from / (used in) operating
activities
(200) (735)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (if capitalised) (3,586) (6,166)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to/from other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other – security deposits paid
Other – security deposits received
-
-
-
-
2.6 Net cash from / (used in) investing
activities
(3,586) (6,166)
3. Cash flows from financing activities
- 10,891
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(31) (581)
3.5 Proceeds from borrowings - 500
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – Lease payments - -
3.10 Net cash from / (used in) financing
activities
(31) 10,810
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
8,229 503
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(200) (735)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(3,586) (6,166)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(31) 10,810
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
4,412 4,112
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 61 554
5.2 Call deposits 4,329 7,653
5.3 Bank overdrafts - -
5.4 Other – Term Deposits < 3 months 22 22
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,412 8,229
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
137
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
41
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (200)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(3,586)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (3,786)
8.4 Cash and cash equivalents at quarter end (item 4.6) 4,412
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 4,412
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.17
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to
Share your feedback